论文部分内容阅读
就铁道部公布的招标文件补充文本,结合工程实践及招投标过程中的使用情况,对评标办法中的不降造费用、总承包风险费、安全生产费相关条款在实际中可能产生的歧义和可能执行难的问题,提出修改或改进的建议;对投标报价算术性校核、不平衡报价的处理、甲供材料设备的供应和结算以及施工图量差的处理等问题进行分析,并提出相关建议。以期通过探讨铁路招投标工作的科学合理性,推动铁路建设管理水平的提高。
In the light of the supplemental texts of the bidding documents published by the Ministry of Railways and the practical application and the application in the process of bidding and tendering, the possible ambiguity that may arise from the relevant provisions of the bid evaluation methods in the bidding without reduction in costs, general contracting risk fees and safe production costs And may be difficult to implement the problem, put forward suggestions for modification or improvement; mathematical analysis of the bidding, unbalanced quotation processing, a supply and settlement of materials and equipment for the construction and processing of the difference between the amount of drawings to analyze and put forward Related suggestions. With a view to discussing the scientific rationality of railway bidding and bidding, we should promote the improvement of the railway construction management level.