论文部分内容阅读
东雷抽水站厂房位于合阳县东雷村原下,安装两台黄河二号大型水泵,配套8000kw电机各一台,净扬程215m,管径1.2m,压力管总长913m,两台总输水量4.40m~3/sec。厂房高程为345.00处。厂房基础为整体基础,底板厚2.0m;机组的基础与厂房底板剐性连接,采用块体式基础,用200钢筋混凝土共151m~3浇筑而成,基础总重377.5吨。
Dongle pumping station plant is located in Dongyang Village, Heyang County, the original installation of two large pumps on the Yellow River II, supporting 8000kw motor each one, the net lift of 215m, diameter of 1.2m, the total length of the pressure pipe 913m, two total water The amount of 4.40m ~ 3 / sec. Plant elevation of 345.00 office. The foundation of the plant is the overall foundation with a bottom thickness of 2.0m. The foundation of the unit is connected to the floor of the plant in a rigid manner. The foundation of the unit is made of block type with a total of 151m ~ 3 reinforced with 200 reinforced concrete. The foundation weight is 377.5 tons.