本文介绍了秦岭电厂低洼地改造工程中进行现场水力冲填施工试验的成果, 论证了平原场地条件下水力机械输浆、冲填粉煤灰筑坝的可行性. 初步确定了相应的施工工艺, 并评价了该施工方法的填筑效果. 表明该施工技术是有效、安全、可行的.
This paper introduces the results of on-site hydraulic filling construction test in the reconstruction project of low-lying land in Qinling Power Plant, and demonstrates the feasibility of hydraulic mechanical conveying and filling of fly ash-filled dam under plain site conditions. The corresponding construction technology is preliminarily determined, and the filling effect of the construction method is evaluated. This shows that the construction technology is effective, safe and feasible.