论文部分内容阅读
介绍了深圳地铁一期工程沿线地下水情况,分析了水质中化学介质对主体结构的腐蚀性机理,并对深圳地铁一期工程所采取的防腐措施作了详细阐述,最后结合工程实际,较为全面地提出了地铁工程提高耐久性的对策
The groundwater situation along the Shenzhen Metro Line 1 project is introduced. The corrosive mechanism of the chemical medium to the main structure in water quality is analyzed. The anticorrosion measures adopted in the first phase project of Shenzhen Metro are elaborated. Finally, according to the engineering practice, a more comprehensive Proposed the subway project to improve the durability of countermeasures