项目名称:某第二发电厂一期工程;投资总额:463900万元;建设内容:一期工程:2×350MW燃煤发电机组。 项目名称:流波水电站;投资总额:17000万元;关键设备:机电设备;建设内容:碾压混凝土坝高73m,引水隧洞长1900m,洞径5.0m,半地下式厂房,水轮发电机组(N=2.5万kW),年发电量为6500万kW·h。 项目名称:12000kW余热发电工程;投资总额:10190万元;关键设备:2台65t中压锅炉,1台1.2万kW抽凝发电机组;建设内容:12000kW余热发电,对周边用热企业实行区域集中供
Project name: Phase I of a second power plant; Total investment: 463,900,000 yuan; Construction content: Phase I: 2 x 350 MW coal-fired generating units. Project Name: Liubo Hydropower Station; Total Investment: RMB 170 million; Key Equipment: Mechanical and Electrical Equipment; Construction Contents: Roller Compacted Concrete Dam 73m in height, diversion tunnel length 1900m, hole diameter 5.0m, semi-underground workshop, hydro-generator unit ( N = 25,000 kW), and the annual power generation is 65 million kW·h. Project Name: 12,000kW waste heat power generation project; total investment: 101.9 million yuan; key equipment: 2 sets of 65t medium pressure boilers and 1 set of 12,000kW condensing generator sets; construction content: 12,000kW waste heat power generation, regional concentration of surrounding heat-using enterprises for