斗转星移、时光飞逝,在当今经济全球化,全国钢铁企业突 飞猛进、日新月异的年代里,太钢烧结厂经过30年的沧桑岁月,正以全新的面貌和骄人的业绩,跨越式向前发展。1971年12月24日,由国家投资,设计能力为174万吨/年的两台75m2带式烧结机建成投产,从此,太钢烧结进入机械化生产。30年来,经过对烧结点火器、抽烟机、烧结机等主体设备改造,烧结机有效面积增加到90m2/台,年产烧结矿达到二百二十 多万吨。1996年12月31日,公司投资建设的100m23#烧结机建 成投产,烧结生产规模进一步扩大,但由于受装备能力、生产管理等诸多因素的影响,烧结矿产、质量仍然满足不了高炉的需
With the rapid development of the global steel industry and the ever-changing steel industry in China, TISCO Sinosteel is now leapfrogging its development by leaps and bounds with a new look and impressive performance over the past 30 years. On December 24, 1971, two 75m2 belt sintering machines with a total investment of 1.74 million tons / year from the state were put into operation. Since then, TISCO sintered into mechanized production. In the past 30 years, the sintering furnace has been upgraded to 90m2 / unit after the renovation of main equipment such as sintering igniter, smoke machine and sintering machine, and the annual output of sinter reaches more than 2.2 million tons. On December 31, 1996, the 100m23 # sintering machine invested and constructed by the company was completed and put into production, and the sintering production scale was further expanded. However, due to the influence of many factors such as equipment capability and production management, the quality of sintered ore and the quality of sintered ore still can not meet the needs of the blast furnace