本文从国外实际施工发生的人工费出发,讨论了国外人工费与项目管理水平的关系。文中举例说明从实际施工角度如何对一个国外项目的人工进行配备,根据国内定额的含义,计算出了这个项目的综合人工工日总计人工费。
Based on the labor costs incurred in the actual construction abroad, this paper discusses the relationship between the foreign labor costs and the project management level. The article gives an example of how to configure the manual labor of a foreign project from the perspective of practical construction. According to the meaning of domestic quota, the total artificial labor cost of this project is calculated.