某新建的17层短肢剪力墙结构住宅楼,结构封顶后发现该房屋第七层的混凝土强度明显偏低,取芯试验显示混凝土强度不足C15,远达不到C25的设计要求。根据第七层剪力墙的轴压比情况,现场采用免支撑混凝土分段置换方法,以高强度自密实混凝土分段置换全部原七层剪力墙混凝土,对此结构进行“加固”。通过预先制定置换顺序和分段置换量,严格控制施工质量,取得了良好的加固效果。结合该工程实例,给出了短肢剪力墙结构用免支撑混凝土置换加固的技术要点。
A new 17-story short-leg shear wall structure residential building, the structure after the roof was found that the seventh floor of the concrete significantly lower strength, core test shows that the concrete strength of less than C15, C25 far below the design requirements. According to the axial compression ratio of the seventh shear wall, the free-standing concrete section replacement method is adopted on-site to replace all the original seven-layer shear wall concrete with high-strength self-compacting concrete. The structure is reinforced by " . Through the pre-set replacement order and the amount of replacement, strict control of construction quality, and achieved good reinforcement effect. Combined with the engineering example, the technical points of replacing and reinforcing the short-leg shear wall structure with free-standing concrete are given.