论文部分内容阅读
巴里贡混凝土面板堆石坝为巴拿马埃斯蒂工程主要建筑物。该工程工期紧迫,为确保工程按期完工,对巴里贡坝先前的设计方案进行了修改。介绍了该坝创新的设计特点与施工技术。
The Barryon concrete faced rockfill dam is the main building of the Asti Project in Panama. Due to the tight construction period, the previous design of Barry Gongba was modified to ensure the project was completed on schedule. Introduced the dam’s innovative design features and construction techniques.