Laboratory pull-out tests on fully grouted rock bolts and cable bolts: Results and lessons learned

来源 :Journal of Rock Mechanics and Geotechnical Engineering | 被引量 : 0次 | 上传用户:matlab_walker
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Laboratory pull-out tests were conducted on the following rock bolts and cable bolts:steel rebars,smooth steel bars,fiberglass reinforced polymer threaded bolts,flexible cable bolts,IR5/IN special cable bolts and Mini-cage cable bolts.The diameter of the tested bolts was between 16 mm and 26 mm.The bolts were grouted in a sandstone sample using resin or cement grouts.The tests were conducted under either constant radial stiffness or constant confining pressure boundary conditions applied on the outer surface of the rock sample.In most tests,the rate of displacement was about 0.02 mm/s.The tests were performed using a pull-out bench that allows testing a wide range of parameters.This paper provides an extensive database of laboratory pull-out test results and confirms the influence of the confining pressure and the embedment length on the pull-out response(rock bolts and cable bolts).It also highlights the sensitivity of the results to the operating conditions and to the behavior of the sample as a whole,which cannot be neglected when the test results are used to assess the bolt-grout or the grouterock interface. Laboratory pull-out tests were conducted on the following rock bolts and cable bolts:steel rebars,smooth steel bars,fiberglass reinforced polymer threaded bolts,flexible cable bolts,IR5/IN special cable bolts and Mini-cage cable bolts.The diameter of the Tested bolts was between 16 mm and 26 mm.The bolts were grouted in a sandstone sample using resin or cement grouts.The tests were conducted under either constant radial stiffness or constant confining pressure boundary conditions applied on the outer surface of the rock sample.In Most tests, the rate of displacement was about 0.02 mm/s.The tests were performed using a pull-out bench that allows testing a wide range of parameters.This paper provides an extensive database of laboratory pull-out test results and confirms the influence Of the confining pressure and the embedment length on the pull-out response (rock bolts and cable bolts).It also highlights the sensitivity of the results to the operating conditions and to the behavior of the Sample as a whole, which cannot be neglected when the test results are used to assess the bolt-grout or the grouterock interface.
其他文献
仿制药的临床疗效与安全性是一致的,即疗效与价值是等价的,质量是一致的。其上市理由是在公众健康利益和风险方面有好处,公众用药的负担下降了,下降的程度就是可以上市或者进
在国有企业发展过程中,加强会计监督工作,能够提高会计信息的准确性和真实性,保障国有资产保值增值,降低企业会计风险.然而,在国有企业实际运营中,对于会计监督的重要性认识
在二维情形,从细观角度,将土石混合体视作石料与土的两相结构,其中,石料为凸多边形,剩余空间为土体。为此,提出凸多边形随机摆放区域的数值模拟方法。该方法首先随机生成一个菱形并
The shear wave(S-wave) component of the total blast vibration always plays an important role in damage to rock or adjacent structures.Numerical approach has bee
期刊
利用高铁某段路基沉降观测数据,对其进行空间插值,获取等时间间隔的沉降观测数据,为后续小波分析,数学建模分析奠定基础.通过三次样条函数插值方法和线性函数插值方法,分别获
摘 要:业绩评价作为全面预算管理的重要环节,要发挥激励效用,必须解决好人的积极性问题。笔者通过多年的实务工作,提出了要真正调动起人的积极性,在经营业绩评价中必须注重评价对象的选择和指标属性的选择对经营业绩评价的关键作用。  关键词:业绩评价;指标;体系构建;选择  作者简介:邱艳玲(1979-),女,中国长安汽车集团股份有限公司财务会计部项目副经理,中级会计师,注册会计师,硕士。  中图分类号:F
核电工程投资大、周期长、接口多、风险大,工程合同管理是工程项目管理的重要组成部分.而合同支付作为合同管理的重要一环,对项目目标的顺利实现有着重要的影响.本文通过对核
随着网络技术的不断普及,互联网在人们生活和工作中得到了全面应用.目前,ERP 系统成为企业信息化建设的主体部分,被企业广泛应用,为企业内部管理带来了很多机遇和挑战.ERP 系
利用中国气象局国家气候中心740站点1960-2000年日降水观测资料,统计分析表明,各气候特征区30 mm以上日降水存在幂律尾分布特征,从中国的整体情况来看,幂律尾指数的均值超过