论文部分内容阅读
摘要:随着建筑业的快速发展,其能源消耗较大,资源浪费严重的问题也逐渐凸显出来,建筑节能已迫在眉睫。监理工程师在建筑节能工程中的质量控制起着重要作用。本文首先阐述了建筑节能工程施工中存在的问题,其次,分析了建筑节能工程施工监理特点。同时,就如何加强建筑节能工程施工的监理控制进行了深入的探讨,具有一定的参考价值。
关键词:建筑;节能工程;施工;监理控制
Abstract: with the rapid development of the construction industry, its energy consumption is bigger, the waste of resources of serious problems also gradually emerges, energy conservation of the building is imminent. Supervision engineer in building energy saving of the engineering quality control plays an important role. This paper expounds the construction energy conservation project construction, the problems in second, analyzes the energy conservation of the building project construction supervision characteristics. At the same time, how to strengthen the construction of the energy conservation of the building project supervision control thoroughly discussed, to have the certain reference value.
Keywords: architecture; Energy conservation project; The construction; Supervision control
中图分类号:TE08文献标识码:A文章编号:
1. 前言
随着建筑业的快速发展,其能源消耗较大,资源浪费严重的问题也逐渐凸显出来,建筑节能已迫在眉睫。自2004年以来,国家及各级地方政府相继出台了大量相关的文件、规范、管理办法等,强制推行建筑节能。建筑节能是建筑物从多方面减少建筑耗能,提高建筑中的能源利用效率。在建筑外围护结构中,外墙所占比重最大,对外墙采取一定的保温隔热措施,可以显著提高节能效果。要保证外墙的保温性能,保温层的施工质量控制相当重要。而工程监理作为六方责任主体之一,贯穿于工程建设的全过程,对工程质量全程监管,故对实施建筑节能工作起着关键作用。
2. 建筑节能工程施工中存在的问题
(1)材料复试批次不足,不符合规范和规程的要求。鉴于目前节能保温材料的试验费用高于土工材料,施工单位为了节省开支,往往整个工程现场减少复试批次甚至只做一次试验取代多次试验,将其代表所有使用的节能材料的性能,严重违反了规范要求。
(2)忽视外墙保温系统的耐候性检验环节。在有关规程中明确指出:“应按规程规定对外墙外保温系统进行耐候性检验”。合格的外保温工程至少要在25年内保持完好,才能够经受住周期性热湿和热冷气候条件的长期作用。否则难以保证外保温系统在规定使用年限内的可靠性,耐候性。
(3)材料供货中瞒天过海。由于市场上保温材料随着性能的不同而价格有差异,信誉度低的保温材料供应商为了追求利益最大化,提供的样品与实际发货不一致,以次充好。如果监理单位监管不严,给劣质材料进入现场创造了条件。
(4)施工过程中偷梁换柱。承包商为了节约成本,在使用聚苯颗粒保温砂浆时,用价格相对低的水泥代替或部分掺加胶粉,在使用保温板时使用厚度不够的板材等不一而足。
3. 建筑节能工程施工监理特点
建筑节能工作作为一项技术性和政策性很强的系统工程,其全面实施在我国时间不长,整体发展水平不高,存在着这样那样的问题是不可避免的。近年来,国家及各级地方政府出台了大量相关的文件、规范、管理办法等,对监理在建筑节能中应做的工作也作出了相应规定。对监理单位的要求主要有:审查建筑节能设计图纸是否经过施工图设计审查,并按照审查合格的设计文件和建筑节能标准的要求实施监理;审查认可建筑节能施工技术方案,编制建筑节能监理实施细则;对易产生热桥和热工缺陷等部位及墙体、屋面保温的施工采取旁站;加强工程竣工验收时节能专项验收。
4. 如何加强建筑节能工程施工的监理控制
(1)切实把好《建筑节能施工方案》审核关
施工方案一定要结合工程特点,明确材料性能要求;施工执行标准、工序、交接检验的要求;细部节点的施工方案以及施工中应注意的事项等。让操作人员一目了然,一看便知道按什么程序怎样施工,达到什么标准。施工方案应经施工单位上级技术主管部门审批和监理单位的签认,方可实施。监理单位应负起责任,编制好监理规划和实施细则。细则中应明确进场材料控制要求、施工过程中的旁站、巡视、平行检测的部位、隐蔽验收部位、质量关键控制点等。
(2)严格认真地审查建筑节能专项施工方案和技术措施
建筑节能工程开工前,总监理工程师应组织专业监理工程师审查承包单位报送建筑节能专项施工方案和技术措施,提出审查意见。在节能建筑施工中,很多重点部位、关键工序大量采用了新材料、新工艺、新技术和新设备。按照规范要求,施工单位都应报送相应的施工工艺措施和确保工程质量的措施。如节能外窗构造节点施工措施、节能屋面保温防水层施工措施以及新型采暖空调设备的安装施工措施等。
(3)进度控制
首先,要求施工单位根据合同要求,提出分项工程进度计划,监理部对总进度计划审查认可,或提出修改意見;督促施工单位按时提交月、旬、周施工进度计划,分析、比较工程进度情况,以达到按计划施工的目的。其次,为了保证工程总进度计划的实现,定期召开关于工程进度专题会议,对进度问题提出监理意见;当发现实际进度落后于计划进度时,及时下发监理工程师通知单,督促施工单位做好调整计划进度工作,同时要求其采取积极有效措施以确保调整后的进度计划的落实。
(4)施工工艺控制
监理人员严格按照如下的施工工艺流程进行工序控制:结构基层处理→吊垂直线、弹控制线、贴饼→复测基层平整度→涂刷界面砂浆→抹胶粉聚苯颗粒保温浆料→保温层验收→抹水泥抗裂砂浆随即抹压涂塑耐碱玻纤网格布→抗裂防护层验收→涂刷高分子乳液弹性底层涂料→刮抗裂柔性耐水腻子→涂料施工。同时,严格工序验收制度,对未经监理验收或验收不合格的工序,不得进入下道工序的施工,以保证各个工序质量处在监控状态。对施工单位按规范要求划分的建筑节能分项工程及检验批进行验收,及时审核和检查节能隐蔽、工程检验批和分项工程质量验评资料。
(5)加强事后控制
做好事后控制,绝不放过一个安全隐患、质量隐患或不合格项,严把质量验收关。节能工程施工完成后施工单位事先进行自查与复验合格,提出质量验收申请报监理单位验收报告。由监理单位总监理工程师组织各专业监理工程师进行质量验收。
1)对每个检验批施工质量予以检查验收,审核报验资料并实测实量、观感检查。必须在主控项目全部合格,一般项目检查点合格率达到90%以上的前提下,才能签字认可;2)对分项工程质量进行审核验收签字;3)对分部工程质量进行验收,审查质量控制资料、安全和功能检验资料,并抽查其主要功能,观感质量状况,在确认该分项工程质量合格后方可签字认可;4)建筑节能工程竣工后,随同单位工程一并进行竣工验收;5)编制的单位工程质量评估报告中应阐明贯彻建筑节能标准的实施情况。存在不合格质量问题提出书面整改通知单,施工单位整改合格回复后,由各专业监理工程师进行复验,均达到合格要求后,报建设单位组织验收小组进行检查验收。建筑节能工程完工后,对节能分部工程进行专项质量评估,并经项目总监理工程师和监理单位有关负责人审核、签字、盖章,做好建筑节能监理工作总结。要做好建筑节能有关工作用表及资料的收集、整理,建筑节能专项验收资料应当单独组卷归档保存。
5.结语
随着建筑节能措施的不断推广深入,节能工程监理的业务水平也在不断的提高。通过事前准备、事中控制、事后验收等一系列措施方法,使施工过程中各主要环节、主要工序处于受控制状态,可及时发现问题解决问题。通过控制的程序化、标准化和科学化,做好质量的过程控制,从而圆满的完成建筑节能工程监理任务。
参考文献:
[1] 何斌. 浅析施工准备阶段土建工程建筑节能监理控制工作[J]. 甘肃科技, 2009,(17) .
[2] 王明许. 建筑节能工程监理质量控制要点分析[J]. 中小企业管理与科技(下旬刊), 2009,(12) .
[3] 付晓峰. 建筑节能中的外墙保温技术[J]. 中国新技术新产品, 2009,(19) .
[4] 田秀斌,梁超. 浅谈建筑节能施工质量问题[J]. 民营科技, 2009,(11) .
[5] 何利. 建筑节能工程施工中存在的问题及监理对策[J]. 建设监理, 2008,(10) .
关键词:建筑;节能工程;施工;监理控制
Abstract: with the rapid development of the construction industry, its energy consumption is bigger, the waste of resources of serious problems also gradually emerges, energy conservation of the building is imminent. Supervision engineer in building energy saving of the engineering quality control plays an important role. This paper expounds the construction energy conservation project construction, the problems in second, analyzes the energy conservation of the building project construction supervision characteristics. At the same time, how to strengthen the construction of the energy conservation of the building project supervision control thoroughly discussed, to have the certain reference value.
Keywords: architecture; Energy conservation project; The construction; Supervision control
中图分类号:TE08文献标识码:A文章编号:
1. 前言
随着建筑业的快速发展,其能源消耗较大,资源浪费严重的问题也逐渐凸显出来,建筑节能已迫在眉睫。自2004年以来,国家及各级地方政府相继出台了大量相关的文件、规范、管理办法等,强制推行建筑节能。建筑节能是建筑物从多方面减少建筑耗能,提高建筑中的能源利用效率。在建筑外围护结构中,外墙所占比重最大,对外墙采取一定的保温隔热措施,可以显著提高节能效果。要保证外墙的保温性能,保温层的施工质量控制相当重要。而工程监理作为六方责任主体之一,贯穿于工程建设的全过程,对工程质量全程监管,故对实施建筑节能工作起着关键作用。
2. 建筑节能工程施工中存在的问题
(1)材料复试批次不足,不符合规范和规程的要求。鉴于目前节能保温材料的试验费用高于土工材料,施工单位为了节省开支,往往整个工程现场减少复试批次甚至只做一次试验取代多次试验,将其代表所有使用的节能材料的性能,严重违反了规范要求。
(2)忽视外墙保温系统的耐候性检验环节。在有关规程中明确指出:“应按规程规定对外墙外保温系统进行耐候性检验”。合格的外保温工程至少要在25年内保持完好,才能够经受住周期性热湿和热冷气候条件的长期作用。否则难以保证外保温系统在规定使用年限内的可靠性,耐候性。
(3)材料供货中瞒天过海。由于市场上保温材料随着性能的不同而价格有差异,信誉度低的保温材料供应商为了追求利益最大化,提供的样品与实际发货不一致,以次充好。如果监理单位监管不严,给劣质材料进入现场创造了条件。
(4)施工过程中偷梁换柱。承包商为了节约成本,在使用聚苯颗粒保温砂浆时,用价格相对低的水泥代替或部分掺加胶粉,在使用保温板时使用厚度不够的板材等不一而足。
3. 建筑节能工程施工监理特点
建筑节能工作作为一项技术性和政策性很强的系统工程,其全面实施在我国时间不长,整体发展水平不高,存在着这样那样的问题是不可避免的。近年来,国家及各级地方政府出台了大量相关的文件、规范、管理办法等,对监理在建筑节能中应做的工作也作出了相应规定。对监理单位的要求主要有:审查建筑节能设计图纸是否经过施工图设计审查,并按照审查合格的设计文件和建筑节能标准的要求实施监理;审查认可建筑节能施工技术方案,编制建筑节能监理实施细则;对易产生热桥和热工缺陷等部位及墙体、屋面保温的施工采取旁站;加强工程竣工验收时节能专项验收。
4. 如何加强建筑节能工程施工的监理控制
(1)切实把好《建筑节能施工方案》审核关
施工方案一定要结合工程特点,明确材料性能要求;施工执行标准、工序、交接检验的要求;细部节点的施工方案以及施工中应注意的事项等。让操作人员一目了然,一看便知道按什么程序怎样施工,达到什么标准。施工方案应经施工单位上级技术主管部门审批和监理单位的签认,方可实施。监理单位应负起责任,编制好监理规划和实施细则。细则中应明确进场材料控制要求、施工过程中的旁站、巡视、平行检测的部位、隐蔽验收部位、质量关键控制点等。
(2)严格认真地审查建筑节能专项施工方案和技术措施
建筑节能工程开工前,总监理工程师应组织专业监理工程师审查承包单位报送建筑节能专项施工方案和技术措施,提出审查意见。在节能建筑施工中,很多重点部位、关键工序大量采用了新材料、新工艺、新技术和新设备。按照规范要求,施工单位都应报送相应的施工工艺措施和确保工程质量的措施。如节能外窗构造节点施工措施、节能屋面保温防水层施工措施以及新型采暖空调设备的安装施工措施等。
(3)进度控制
首先,要求施工单位根据合同要求,提出分项工程进度计划,监理部对总进度计划审查认可,或提出修改意見;督促施工单位按时提交月、旬、周施工进度计划,分析、比较工程进度情况,以达到按计划施工的目的。其次,为了保证工程总进度计划的实现,定期召开关于工程进度专题会议,对进度问题提出监理意见;当发现实际进度落后于计划进度时,及时下发监理工程师通知单,督促施工单位做好调整计划进度工作,同时要求其采取积极有效措施以确保调整后的进度计划的落实。
(4)施工工艺控制
监理人员严格按照如下的施工工艺流程进行工序控制:结构基层处理→吊垂直线、弹控制线、贴饼→复测基层平整度→涂刷界面砂浆→抹胶粉聚苯颗粒保温浆料→保温层验收→抹水泥抗裂砂浆随即抹压涂塑耐碱玻纤网格布→抗裂防护层验收→涂刷高分子乳液弹性底层涂料→刮抗裂柔性耐水腻子→涂料施工。同时,严格工序验收制度,对未经监理验收或验收不合格的工序,不得进入下道工序的施工,以保证各个工序质量处在监控状态。对施工单位按规范要求划分的建筑节能分项工程及检验批进行验收,及时审核和检查节能隐蔽、工程检验批和分项工程质量验评资料。
(5)加强事后控制
做好事后控制,绝不放过一个安全隐患、质量隐患或不合格项,严把质量验收关。节能工程施工完成后施工单位事先进行自查与复验合格,提出质量验收申请报监理单位验收报告。由监理单位总监理工程师组织各专业监理工程师进行质量验收。
1)对每个检验批施工质量予以检查验收,审核报验资料并实测实量、观感检查。必须在主控项目全部合格,一般项目检查点合格率达到90%以上的前提下,才能签字认可;2)对分项工程质量进行审核验收签字;3)对分部工程质量进行验收,审查质量控制资料、安全和功能检验资料,并抽查其主要功能,观感质量状况,在确认该分项工程质量合格后方可签字认可;4)建筑节能工程竣工后,随同单位工程一并进行竣工验收;5)编制的单位工程质量评估报告中应阐明贯彻建筑节能标准的实施情况。存在不合格质量问题提出书面整改通知单,施工单位整改合格回复后,由各专业监理工程师进行复验,均达到合格要求后,报建设单位组织验收小组进行检查验收。建筑节能工程完工后,对节能分部工程进行专项质量评估,并经项目总监理工程师和监理单位有关负责人审核、签字、盖章,做好建筑节能监理工作总结。要做好建筑节能有关工作用表及资料的收集、整理,建筑节能专项验收资料应当单独组卷归档保存。
5.结语
随着建筑节能措施的不断推广深入,节能工程监理的业务水平也在不断的提高。通过事前准备、事中控制、事后验收等一系列措施方法,使施工过程中各主要环节、主要工序处于受控制状态,可及时发现问题解决问题。通过控制的程序化、标准化和科学化,做好质量的过程控制,从而圆满的完成建筑节能工程监理任务。
参考文献:
[1] 何斌. 浅析施工准备阶段土建工程建筑节能监理控制工作[J]. 甘肃科技, 2009,(17) .
[2] 王明许. 建筑节能工程监理质量控制要点分析[J]. 中小企业管理与科技(下旬刊), 2009,(12) .
[3] 付晓峰. 建筑节能中的外墙保温技术[J]. 中国新技术新产品, 2009,(19) .
[4] 田秀斌,梁超. 浅谈建筑节能施工质量问题[J]. 民营科技, 2009,(11) .
[5] 何利. 建筑节能工程施工中存在的问题及监理对策[J]. 建设监理, 2008,(10) .