摘要:工程造价是关系国计民生的重要事情,而施工组织设计掌控着工程的整体质量和整个工程的造价。施工组织设计是合理确定工程造价的关键。优化施工组织设计是控制工程造价的基础。施工组织设计是一种微观性投资控制,针对施工特点编制而成的。市场的竞争异常激烈,对施工企业在施工组织等方面的要求更高。但是依旧有很多施工企业对此并未引起足够的重视,常出现编制依据问题、施工组织设计流于形式等问题。从影响因素来说,施工工期、施工方案、施工组织平面布置是施工组织设计影响工程造价的关键。笔者在文中最后提出一些优化施工组织设计、合理确定工程造价的措施。
关键词:施工组织设计, 工程造价, 施工特点
Abstract: The project cost is the important things relating to the relationship, and the construction organization design for control of the engineering of the overall quality and the cost of the whole project. The construction organization design is reasonable project cost of the key. Optimizing the construction organization design is to control the engineering cost basis. The construction organization design is a kind of Wei Guanxing investment control, in view of the construction characteristics weaves and be become. The fierce market competition, the construction enterprise in the construction organization and the requirements is higher. But there are still a lot of construction enterprise to it has not received enough attention, often appear compilation basis, the construction organization design form now. From the influence factors for, construction period, the construction scheme, construction layout is the construction organization design influence the project cost of the key. In the paper, the author finally put forward some optimizing the construction organization design, reasonable construction cost measures.
Key Words: construction organization design, engineering cost, construction characteristics
中圖分类号:TU723.3文献标识码:A文章编号:
施工组织设计在工程的建设中起着重大作用。施工组织设计掌控着工程的整体质量和整个工程的造价。所以,施工组织设计是一项工程成功与否的重大前提。目前,越来越多的施工组织层出不穷,高效的施工组织对工程造价影响很大。本文就施工组织设计对工程造价的影响作出重要详细的分析。
1 工程造价
工程造价是一项工程开支的费用总和。一个项目有评估决策、设计招标、工程招标、工程开工建设直至竣工验收等一系列活动,这些活动开支就构成了工程造价。工程造价的另一层意思包含一项工程在土地市场、技术市场等交易活动中所形成的总价格。工程造价的确定是一个系统的管理过程,每个工程都单独计算造价,每一阶段都不能超出前一阶段制定的数额。工程造价的有效控制需要在优化方案的基础上,采用一定的措施把工程造价控制在合理的范围内。
2 施工组织设计
包括四项基本内容:①施工方案、②施工进度计划、③施工现场平面布置、④有关暂设工程的供应。后两项是施工准备的依据,前两项主要用于指导施工。为了满足不同的实际需要,施工组织设计的繁简根据工程规模大小、结构特点的不同而定。施工组织总设计是为解决整个建设项目施工的全局问题的。
编制施工组织设计要做好的工作,首先必须熟悉工程概况,包括熟悉建筑工程指定的专门用途、结构、造型、体积、面积、材质、技术水平、建筑等级和建筑标准、受气候、地质的影响等。其次是必须做好充分做好施工准备,包括做好图纸会审、组织劳动力布置施工现场、组织材料进场、做好抄平放线工作等。
施工组织设计是工程的重要组成部分,其直接涉及工程成本,影响工程的进度。工程造价由施工组织设计确定,工程造价的高低很大程度上取决于施工方案的先进与否。只有根据合理的施工方案和技术,才能确定合理的工程造价。工程造价的合理确定也能够影响着施工方案的优化。施工组织设计是合理确定工程造价的关键。优化施工组织设计是控制工程造价的基础。
3施工组织设计的意义
3.1施工组织设计是一种微观性投资控制
施工组织设计所进行的投资控制是针对建安过程,有利于宏观的固定资产管理。其着眼点是控制住具体项目的实施过程。从投资环境开始,一个环节一个环节地控制。
3.2施工组织设计针对施工特点编制
施工阶段需要大量的资金投放,随着施工的进行,资金要相继投入。必须把握住施工阶段这个最突出的特点。施工组织设计是一种以经济作保障的技术措施。施工阶段是暴露问题最多的阶段。根据施工组织设计,使工程项目实体实施是施工阶段要解决的根本问题。在施工阶段,不能妥善处理暴露出来的问题,工程项目总体质量就难以保证,投资就会失控。
4 施工组织设计的问题
随着市场经济的建立,市场的竞争异常激烈,客观形势对施工企业在技术装备、人员素质、施工组织等方面的要求更高了。在新形势下,很多施工企业对此并未引起足够的重视,常出现下列问题。
4.1 编制依据存在问题
这方面的问题包括:施工组织设计的可靠性无从着手;技术方法、施工工艺不够合理;编制依据不足,提供不出可靠的依据。编制依据的有关文件已经过期作废。
4.2 施工组织设计流于形式
在签订工程承包合同时,业主要认真进行技术经济比较。由于从收到招标文件到递交投标书的时间往往很短,所以投标书中关于施工组织设计的内容侧重于施工规划和布置,未能全面反映施工操作方案的技术保证措施。施工组织设计是一项技术性很强的工作,不认真研究施工组织措施就会使施工组织设计流于形式。所以,施工组织设计仍然需要加强,只有不断的查漏补缺,方能保证在工作中踏实迈进。
关键词:施工组织设计, 工程造价, 施工特点
Abstract: The project cost is the important things relating to the relationship, and the construction organization design for control of the engineering of the overall quality and the cost of the whole project. The construction organization design is reasonable project cost of the key. Optimizing the construction organization design is to control the engineering cost basis. The construction organization design is a kind of Wei Guanxing investment control, in view of the construction characteristics weaves and be become. The fierce market competition, the construction enterprise in the construction organization and the requirements is higher. But there are still a lot of construction enterprise to it has not received enough attention, often appear compilation basis, the construction organization design form now. From the influence factors for, construction period, the construction scheme, construction layout is the construction organization design influence the project cost of the key. In the paper, the author finally put forward some optimizing the construction organization design, reasonable construction cost measures.
Key Words: construction organization design, engineering cost, construction characteristics
中圖分类号:TU723.3文献标识码:A文章编号:
施工组织设计在工程的建设中起着重大作用。施工组织设计掌控着工程的整体质量和整个工程的造价。所以,施工组织设计是一项工程成功与否的重大前提。目前,越来越多的施工组织层出不穷,高效的施工组织对工程造价影响很大。本文就施工组织设计对工程造价的影响作出重要详细的分析。
1 工程造价
工程造价是一项工程开支的费用总和。一个项目有评估决策、设计招标、工程招标、工程开工建设直至竣工验收等一系列活动,这些活动开支就构成了工程造价。工程造价的另一层意思包含一项工程在土地市场、技术市场等交易活动中所形成的总价格。工程造价的确定是一个系统的管理过程,每个工程都单独计算造价,每一阶段都不能超出前一阶段制定的数额。工程造价的有效控制需要在优化方案的基础上,采用一定的措施把工程造价控制在合理的范围内。
2 施工组织设计
包括四项基本内容:①施工方案、②施工进度计划、③施工现场平面布置、④有关暂设工程的供应。后两项是施工准备的依据,前两项主要用于指导施工。为了满足不同的实际需要,施工组织设计的繁简根据工程规模大小、结构特点的不同而定。施工组织总设计是为解决整个建设项目施工的全局问题的。
编制施工组织设计要做好的工作,首先必须熟悉工程概况,包括熟悉建筑工程指定的专门用途、结构、造型、体积、面积、材质、技术水平、建筑等级和建筑标准、受气候、地质的影响等。其次是必须做好充分做好施工准备,包括做好图纸会审、组织劳动力布置施工现场、组织材料进场、做好抄平放线工作等。
施工组织设计是工程的重要组成部分,其直接涉及工程成本,影响工程的进度。工程造价由施工组织设计确定,工程造价的高低很大程度上取决于施工方案的先进与否。只有根据合理的施工方案和技术,才能确定合理的工程造价。工程造价的合理确定也能够影响着施工方案的优化。施工组织设计是合理确定工程造价的关键。优化施工组织设计是控制工程造价的基础。
3施工组织设计的意义
3.1施工组织设计是一种微观性投资控制
施工组织设计所进行的投资控制是针对建安过程,有利于宏观的固定资产管理。其着眼点是控制住具体项目的实施过程。从投资环境开始,一个环节一个环节地控制。
3.2施工组织设计针对施工特点编制
施工阶段需要大量的资金投放,随着施工的进行,资金要相继投入。必须把握住施工阶段这个最突出的特点。施工组织设计是一种以经济作保障的技术措施。施工阶段是暴露问题最多的阶段。根据施工组织设计,使工程项目实体实施是施工阶段要解决的根本问题。在施工阶段,不能妥善处理暴露出来的问题,工程项目总体质量就难以保证,投资就会失控。
4 施工组织设计的问题
随着市场经济的建立,市场的竞争异常激烈,客观形势对施工企业在技术装备、人员素质、施工组织等方面的要求更高了。在新形势下,很多施工企业对此并未引起足够的重视,常出现下列问题。
4.1 编制依据存在问题
这方面的问题包括:施工组织设计的可靠性无从着手;技术方法、施工工艺不够合理;编制依据不足,提供不出可靠的依据。编制依据的有关文件已经过期作废。
4.2 施工组织设计流于形式
在签订工程承包合同时,业主要认真进行技术经济比较。由于从收到招标文件到递交投标书的时间往往很短,所以投标书中关于施工组织设计的内容侧重于施工规划和布置,未能全面反映施工操作方案的技术保证措施。施工组织设计是一项技术性很强的工作,不认真研究施工组织措施就会使施工组织设计流于形式。所以,施工组织设计仍然需要加强,只有不断的查漏补缺,方能保证在工作中踏实迈进。