论文部分内容阅读
本文分析了建筑混凝土预应力转换大梁施工及承重支模技术,同时对承重系统预先采取了技术加强措施,大大节省了承重架系统费用,取得较好的经济效益。
In this paper, the construction of prestressed concrete beams and the technology of bearing and supporting are analyzed. In the meantime, some technical measures are taken to reinforce the load-bearing system, which greatly saves the cost of the bearing system and achieves better economic benefits.