论文部分内容阅读
这组数字,真实地记录了楚雄矿冶面对严重的资源危机率先成功突围创下的辉煌业绩──2001年,完成精矿含铜13542吨。精矿吨铜制造成本7266元,在全国同行业中遥遥领先;2002年,完成精矿含铜15188吨。精矿吨铜制造成本7069元,再创全国铜矿企业最好水平;2003年,完成精矿含铜16200吨。
This set of figures truly records the brilliant achievements of Chuxiong Mining and Metallurgical Works, which succeeded in breaking through the severe resource crisis. In 2001, 13,542 tons of copper concentrate was completed. Concentrate tons of copper manufacturing costs 7,266 yuan, far ahead of the industry in the country; in 2002, completed 15,188 tons of copper concentrate. Concentrate tons of copper manufacturing costs 7069 yuan, creating the best level of the national copper mines; 2003, completed 16,200 tons of copper concentrates.