论文部分内容阅读
介绍了某厂600 MW机组设备概况及设计煤种指标,分析了燃用非设计煤种时飞灰可燃物超标的原因和对锅炉经济运行的影响,介绍了改造措施和调控方法,解决了飞灰可燃物偏高的问题。
This paper introduces the general situation of equipment and design coal index of a 600 MW unit in a plant. It analyzes the cause of exceeding the standard of combustible material and the impact on the economic operation of boiler when using non - design coal, introduces the measures of reconstruction and control, Ash fuel high problem.