论文部分内容阅读
介绍了碧口水电站大坝“5·12”地震后的震损情况、水库运行情况和大坝安全监测成果分析,提出高震区水电站大坝设计中应注意的问题。
This paper introduces the earthquake damage of Bikou hydropower station dam, the operation of the reservoir and the monitoring results of the dam safety monitoring, and puts forward the problems that should be paid attention to in the dam design of the high earthquake zone hydropower station.