由中冶公司得标、云南国际合作公司转包土建设计和施工的伊拉克14个变电站工程,经项目组全体人员努力,1988年11月胜利竣工。该工程单个变电站建筑面积448平方米,为单层砖混结物,包括警卫室、控制室、住房、室外变压器基础、电缆沟等,在工程进行中,取消了战争地区的5个站,实际实施14个站,合计建筑面积6272平方米,总造价643万
The 14 substation projects in Iraq that were subcontracted by China Metallurgical Co., Ltd. and won the bid by Yunnan International Cooperation Co., Ltd. were successfully completed by the crew of the project team in November 1988. The single substation of this project has a construction area of 448 square meters, which is a single-layer brick mixture, including guard room, control room, housing, outdoor transformer foundation, cable trench, etc. During the project, five stations in the war area were cancelled. Implementation of 14 stations, a total construction area of 6272 square meters, a total cost of 6.43 million