摘要:近年来,随着市场经济的健康、快速发展,一些新型的施工工艺及技术日益出现。建筑外墙的干挂石材就其特殊风格及其高雅端庄的外表,受到社会各界的广泛关注及认可,不仅弥补了普通饰面石材中湿贴法装饰导致的墙面“花脸”、泛碱等不足,而且还具备装饰效果良好、减小建筑物重量以及安装精确度高等优势,被广泛应用于建筑外墙干挂石材的施工中。以下本文简单介绍控制外墙干挂石材的施工质量的重要性,对影响施工质量的因素进行全面分析,并对此提出相应的完善措施。
关键词:外墙干挂石材;施工质量;控制措施
Abstract: in recent years, along with the market economy healthy and fast development, some new construction technology and technology increasingly appear. The exterior walls dry hanging stone is the special style and dignified and elegant appearance, is of social concern and the approval, not only to make up for the ordinary facing stone in wet method of metope adornment to put stress FanJian, etc, but also have adornment effect is good, reduce weight building and installation accuracy higher advantage, is widely used in exterior walls of stone material in dry hanging construction. The following the paper simply introduces control dry hanging wall of material of stone of the importance of the quality of construction, the effect factors on the quality of the construction of the complete analysis, and put forward the corresponding measures to improve this.
Keywords: exterior wall dry hanging stone; Construction quality; Control measures
中图分类号:TV523文献标识码:A 文章编号:
绪论
近年来,随着市场经济的快速发展,以及建筑行业的日益发展,我国装饰行业空前繁荣,干挂石材逐渐被广泛应用于建筑外墙的装饰工程中[1]。并且由于干挂石材的使用高度逐渐增高、造型复杂以及体量较大等因素,其安装工艺的要求也相对严格。为确保干挂石材的施工安全,应严格要求其施工质量的管理控制。
1.加强控制外墙干挂石材施工质量的重要性
建筑外墙干挂石材的施工作为一项操作较为复杂的工程,其施工质量的好坏,不仅将影响到整个工程的质量,而且也给国家及人民的财产安全带来一定的损失。对此,重视建筑外墙干挂石材的施工过程,加以控制施工过程的质量,是保障整个建筑工程得以继续开展的保证,从而增强了建筑外墙的感观效果。
2.影响外墙干挂石材施工质量的因素分析
2.1施工因素的分析
在外墙干挂石材的施工过程中,还存在较多的质量问题,而影响其质量的因素主要包括以下几个方面:第一,安装工艺的方式有误,在进行每道工序的施工时,施工单位并未加以检查并校正其的不足之处,造成外墙钢制结构的平整度及垂直度严重超标。第二,施工定位及放线有误,导致外墙骨架安装的标高与垂直度发生偏差[2]。第三,未按照施工设计的具体要求进行埋件,安装转接件的松弛,焊接骨架的质量不高,以及尚未准备防锈、防腐、避雷接地的处理措施等,导致整个项目工程的安全性不高。第四,骨架和干挂石材的安装松懈,干挂配件以及粘贴材料的质量不高,以及尚未准备钢配件的防腐、防锈措施等。第五,密封胶的分布不均、粘接力不强等。打胶时其板面的污染过多,进一步影响了其的外观质量。第六,板材的色泽较差,存在棱角缺失、裂纹的现象。加上其安裝的平整度与垂直度严重超标,板缝粘结不均匀,接缝不平等。第七,突出部位附近的板材,选用整板套割的方式,边缘衔接不吻合,尺寸偏差,流水坡的走向错误等,这些均导致外墙干挂石材的施工质量不高。
2.2前期准备阶段的因素分析
在外墙干挂石材的施工前期,施工单位应做好施工准备阶段的质量控制。检查好施工图纸是否与设计的要求一致;检查施工队伍的潜力,以及检查施工方案的齐全与否。然而在实践中,项目工程的施工单位并未认真检查其的施工图纸及计算书,未在图纸上标明其的施工要点,导致施工人员无法正常的进行施工。其次,施工单位尚未检查施工队伍的潜力,造成毫无潜质或者潜质不高的施工人员也参与到其中,参差不齐。最后,外墙干挂石材的安装方案不一致,施工人员的作业不统一等,这些均导致外墙干挂石材的施工难以顺利开展,也就难以保障工程项目的施工质量。
3.外墙干挂石材施工的质量控制措施
3.1石材洗缝与打胶过程的质量控制
安装石材完毕后,应对工程的局部隙缝进行清洗,促使纵横隙缝的整体更为顺直均匀,从而提高外墙装饰的效果。与此同时,进行石材的打胶施工:建设单位应对其的样板进行施工,符合要求后,再安排专门的人员进行操作。控制密封耐候胶的厚度为3.6至4.6毫米,封胶的宽度应大于厚度的两倍[3]。对于深度较大的密封槽口低端,选取聚乙烯的发泡材料进行填塞。接缝内的密封耐候胶应保持相互对立的面粘,确保密封胶缝的宽窄均匀、横平竖直、饱满密实、无气泡等,从而有效控制石材封胶的施工质量。
3.2外墙装饰干挂石材的质量控制
首先,在安装固定细部周围的干挂板材过程中,应确保其位置的准确,及时打磨凸出的部位,确保其位置的竖直横平。至于轻度损坏的干挂石材,安装时,选取不显著的角落进行安装,利用原石粉末与固定的石材胶水进行拌合并修补。其次,做好干挂板材临时固定的工作。在安装板材的过程中,设置构件下方为固定的形态,而其上方则为临时设置的状态。将粘结胶灌注石材下方的钻孔内,并插入提前准备的不锈钢的垫片进行固定,之后便依次进行施工,待固定胶干完毕后,取出不锈钢的垫片。最后,细部区域的处理:采取整板套割的细部石材,切忌采用零碎拼装的材料。并且所选的板材,应做到现场量取、套割以及安装等。选取设计留滴水线、留滴水槽、流水坡的方式,加以控制在窗洞部位的石材压边质量,确保窗洞部位干挂石材的准确有效。
3.3干挂原材料的质量控制
首先,龙骨的质量控制。龙骨分有主龙骨与副龙骨两部分,应选取槽钢以及角钢的设备进行装置。除了检查其外观、试验报告、合格证等方面的质量外,必须严格对其镀锌层的质量、均匀性以及光泽度等进行检查,合格后才能开始现场抽样,并将其送往实验室进行检测,检测通过后才可使用[4]。其次,装饰外墙表面的石材控制。影响外墙装饰效果的主要因素便是石材,对此,在选取石材的原材料时,应小心谨慎。注意石材的颜色、平整度、尺寸、规格等均应符合标准,允许出现偏差,但禁止偏差过大。第三,外墙挂件控制。认真检查挂件产品的出厂合格证,看其是否符合设计图纸的要求。检查钢板或不锈钢板的化学分析、出厂合格证等是否完整,最后检查普通预埋件或钢零件的镀锌层是否损坏等。第四,结构胶以及密封胶的控制。对结构胶的出厂合格证与产地证书、耐永年限的保证书以及脱离粘结性的试验等进行仔细检查,看其能否在有限的时间内使用完毕,并且给其取样,送往试验室复验。检查密封胶的性能报告及出厂证明是否完整,检查其的耐老化、耐用年限等。
3.4 石材加工制造的质量控制
依照施工设计的尺度以及施工图纸的具体要求,加以固定专用模具于台架之上,进而有序进行石材的打孔工作。为确保打孔位置的垂直准确,应事先在托架上钉有一个定型的石板,固定石板于托架之上,要求钻头与打孔小面保持垂直,保证钻孔成型后孔位的准确有效,控制孔深21毫米,钻头4.6毫米,孔径6毫米。其次,在石材的背部粉刷饱和度不够的树脂胶,通过一布二胶的方法,选取无捻、无碱的24目玻璃丝布。在首次粉刷石板前,先在石板上打上记号,并处理干净石板上的杂污、浮灰,再进行第一次的刷胶[5]。对于粉刷用的胶,应随用随配,避免刷胶凝固。此外,警惕边角部落的刷胶,尤其是打孔位置的粉刷,应分布均匀。首次墙胶刷完后,开始铺贴含有玻璃纤维的网格布,利用刷子逐次刷平后,便可进行第二次的刷胶。控制好其粉刷的胶量,避免由于粉刷过多而流至石材的小面,增加嵌缝的难度,从而影响外墙刷胶的施工质量。
4.结束语
综上所述,装饰外墙的干挂石材,是随着工程设计理念以及石材装饰质量的不断提高而逐渐发展起来的。设计理念作为外墙干挂石材向前发展的基础,其施工质量的优劣,将决定其的事业发展。此外,施工单位以及施工人员的综合素质也直接关系到外墙装饰行业的发展,严格的质量控制,能有效保证其的施工质量,从而确保其施工工程的安全性能。
【参考文献】
[1] 韩瑛.外墙XRY节能装饰板干挂施工技术的应用[J].山西建筑.2012(04).
[2] 何维荣.外墙干挂石材施工技术在多层建筑中的应用[J].科技创新导报.2009(16).
[3] 高拥军.干挂石材幕墙采用现浇聚氨酯保温的探讨[J].建筑节能.2009(02).
[4] 张小妮,张小冉.干挂石材在预制框架结构改造工程中的应用[J].工程质量.2009(09).
[5] 万剑和,孙晔玲,张煜.干挂石材幕墙用环氧胶粘剂与云石胶的比较[J].江苏建筑.2010(02).
注:文章内所有公式及图表请用PDF形式查看。
关键词:外墙干挂石材;施工质量;控制措施
Abstract: in recent years, along with the market economy healthy and fast development, some new construction technology and technology increasingly appear. The exterior walls dry hanging stone is the special style and dignified and elegant appearance, is of social concern and the approval, not only to make up for the ordinary facing stone in wet method of metope adornment to put stress FanJian, etc, but also have adornment effect is good, reduce weight building and installation accuracy higher advantage, is widely used in exterior walls of stone material in dry hanging construction. The following the paper simply introduces control dry hanging wall of material of stone of the importance of the quality of construction, the effect factors on the quality of the construction of the complete analysis, and put forward the corresponding measures to improve this.
Keywords: exterior wall dry hanging stone; Construction quality; Control measures
中图分类号:TV523文献标识码:A 文章编号:
绪论
近年来,随着市场经济的快速发展,以及建筑行业的日益发展,我国装饰行业空前繁荣,干挂石材逐渐被广泛应用于建筑外墙的装饰工程中[1]。并且由于干挂石材的使用高度逐渐增高、造型复杂以及体量较大等因素,其安装工艺的要求也相对严格。为确保干挂石材的施工安全,应严格要求其施工质量的管理控制。
1.加强控制外墙干挂石材施工质量的重要性
建筑外墙干挂石材的施工作为一项操作较为复杂的工程,其施工质量的好坏,不仅将影响到整个工程的质量,而且也给国家及人民的财产安全带来一定的损失。对此,重视建筑外墙干挂石材的施工过程,加以控制施工过程的质量,是保障整个建筑工程得以继续开展的保证,从而增强了建筑外墙的感观效果。
2.影响外墙干挂石材施工质量的因素分析
2.1施工因素的分析
在外墙干挂石材的施工过程中,还存在较多的质量问题,而影响其质量的因素主要包括以下几个方面:第一,安装工艺的方式有误,在进行每道工序的施工时,施工单位并未加以检查并校正其的不足之处,造成外墙钢制结构的平整度及垂直度严重超标。第二,施工定位及放线有误,导致外墙骨架安装的标高与垂直度发生偏差[2]。第三,未按照施工设计的具体要求进行埋件,安装转接件的松弛,焊接骨架的质量不高,以及尚未准备防锈、防腐、避雷接地的处理措施等,导致整个项目工程的安全性不高。第四,骨架和干挂石材的安装松懈,干挂配件以及粘贴材料的质量不高,以及尚未准备钢配件的防腐、防锈措施等。第五,密封胶的分布不均、粘接力不强等。打胶时其板面的污染过多,进一步影响了其的外观质量。第六,板材的色泽较差,存在棱角缺失、裂纹的现象。加上其安裝的平整度与垂直度严重超标,板缝粘结不均匀,接缝不平等。第七,突出部位附近的板材,选用整板套割的方式,边缘衔接不吻合,尺寸偏差,流水坡的走向错误等,这些均导致外墙干挂石材的施工质量不高。
2.2前期准备阶段的因素分析
在外墙干挂石材的施工前期,施工单位应做好施工准备阶段的质量控制。检查好施工图纸是否与设计的要求一致;检查施工队伍的潜力,以及检查施工方案的齐全与否。然而在实践中,项目工程的施工单位并未认真检查其的施工图纸及计算书,未在图纸上标明其的施工要点,导致施工人员无法正常的进行施工。其次,施工单位尚未检查施工队伍的潜力,造成毫无潜质或者潜质不高的施工人员也参与到其中,参差不齐。最后,外墙干挂石材的安装方案不一致,施工人员的作业不统一等,这些均导致外墙干挂石材的施工难以顺利开展,也就难以保障工程项目的施工质量。
3.外墙干挂石材施工的质量控制措施
3.1石材洗缝与打胶过程的质量控制
安装石材完毕后,应对工程的局部隙缝进行清洗,促使纵横隙缝的整体更为顺直均匀,从而提高外墙装饰的效果。与此同时,进行石材的打胶施工:建设单位应对其的样板进行施工,符合要求后,再安排专门的人员进行操作。控制密封耐候胶的厚度为3.6至4.6毫米,封胶的宽度应大于厚度的两倍[3]。对于深度较大的密封槽口低端,选取聚乙烯的发泡材料进行填塞。接缝内的密封耐候胶应保持相互对立的面粘,确保密封胶缝的宽窄均匀、横平竖直、饱满密实、无气泡等,从而有效控制石材封胶的施工质量。
3.2外墙装饰干挂石材的质量控制
首先,在安装固定细部周围的干挂板材过程中,应确保其位置的准确,及时打磨凸出的部位,确保其位置的竖直横平。至于轻度损坏的干挂石材,安装时,选取不显著的角落进行安装,利用原石粉末与固定的石材胶水进行拌合并修补。其次,做好干挂板材临时固定的工作。在安装板材的过程中,设置构件下方为固定的形态,而其上方则为临时设置的状态。将粘结胶灌注石材下方的钻孔内,并插入提前准备的不锈钢的垫片进行固定,之后便依次进行施工,待固定胶干完毕后,取出不锈钢的垫片。最后,细部区域的处理:采取整板套割的细部石材,切忌采用零碎拼装的材料。并且所选的板材,应做到现场量取、套割以及安装等。选取设计留滴水线、留滴水槽、流水坡的方式,加以控制在窗洞部位的石材压边质量,确保窗洞部位干挂石材的准确有效。
3.3干挂原材料的质量控制
首先,龙骨的质量控制。龙骨分有主龙骨与副龙骨两部分,应选取槽钢以及角钢的设备进行装置。除了检查其外观、试验报告、合格证等方面的质量外,必须严格对其镀锌层的质量、均匀性以及光泽度等进行检查,合格后才能开始现场抽样,并将其送往实验室进行检测,检测通过后才可使用[4]。其次,装饰外墙表面的石材控制。影响外墙装饰效果的主要因素便是石材,对此,在选取石材的原材料时,应小心谨慎。注意石材的颜色、平整度、尺寸、规格等均应符合标准,允许出现偏差,但禁止偏差过大。第三,外墙挂件控制。认真检查挂件产品的出厂合格证,看其是否符合设计图纸的要求。检查钢板或不锈钢板的化学分析、出厂合格证等是否完整,最后检查普通预埋件或钢零件的镀锌层是否损坏等。第四,结构胶以及密封胶的控制。对结构胶的出厂合格证与产地证书、耐永年限的保证书以及脱离粘结性的试验等进行仔细检查,看其能否在有限的时间内使用完毕,并且给其取样,送往试验室复验。检查密封胶的性能报告及出厂证明是否完整,检查其的耐老化、耐用年限等。
3.4 石材加工制造的质量控制
依照施工设计的尺度以及施工图纸的具体要求,加以固定专用模具于台架之上,进而有序进行石材的打孔工作。为确保打孔位置的垂直准确,应事先在托架上钉有一个定型的石板,固定石板于托架之上,要求钻头与打孔小面保持垂直,保证钻孔成型后孔位的准确有效,控制孔深21毫米,钻头4.6毫米,孔径6毫米。其次,在石材的背部粉刷饱和度不够的树脂胶,通过一布二胶的方法,选取无捻、无碱的24目玻璃丝布。在首次粉刷石板前,先在石板上打上记号,并处理干净石板上的杂污、浮灰,再进行第一次的刷胶[5]。对于粉刷用的胶,应随用随配,避免刷胶凝固。此外,警惕边角部落的刷胶,尤其是打孔位置的粉刷,应分布均匀。首次墙胶刷完后,开始铺贴含有玻璃纤维的网格布,利用刷子逐次刷平后,便可进行第二次的刷胶。控制好其粉刷的胶量,避免由于粉刷过多而流至石材的小面,增加嵌缝的难度,从而影响外墙刷胶的施工质量。
4.结束语
综上所述,装饰外墙的干挂石材,是随着工程设计理念以及石材装饰质量的不断提高而逐渐发展起来的。设计理念作为外墙干挂石材向前发展的基础,其施工质量的优劣,将决定其的事业发展。此外,施工单位以及施工人员的综合素质也直接关系到外墙装饰行业的发展,严格的质量控制,能有效保证其的施工质量,从而确保其施工工程的安全性能。
【参考文献】
[1] 韩瑛.外墙XRY节能装饰板干挂施工技术的应用[J].山西建筑.2012(04).
[2] 何维荣.外墙干挂石材施工技术在多层建筑中的应用[J].科技创新导报.2009(16).
[3] 高拥军.干挂石材幕墙采用现浇聚氨酯保温的探讨[J].建筑节能.2009(02).
[4] 张小妮,张小冉.干挂石材在预制框架结构改造工程中的应用[J].工程质量.2009(09).
[5] 万剑和,孙晔玲,张煜.干挂石材幕墙用环氧胶粘剂与云石胶的比较[J].江苏建筑.2010(02).
注:文章内所有公式及图表请用PDF形式查看。