论文部分内容阅读
介绍了小浪底坝前水沙因子站吊船过河缆道工程引缆过河及架升主索的施工工艺 ,并对其关键的施工过程进行了描述。
This paper introduces the construction process of the cable-passing river and lifting of the main cable of the gondola over the river and cable channel in Xiaolangdi Dam, and describes the key construction process.