美国(ERICO)公司香港基围(亚洲)钢筋接驳有限公司钢筋接驳演示会于1987年3月5日在上海市冶矿机械技术研究所举行。参加会议的有华东建筑设计院、同济大学等单位近80名专家和代表。该公司负责人介绍了钢筋接驳新技术在高层建筑、地铁、隧道、桥梁等施工中的实际应用和操作过程,并作了螺纹钢筋机械接驳(Lenton Rebar Splice)和基围钢筋机械接
The United States (ERICO) company’s Hong Kong Kei Wai (Asia) Reinforced Steel Connection Co., Ltd. Reinforced Connection Demonstration Conference was held on March 5, 1987 at the Shanghai Institute of Mining and Mineral Technology. At the conference, there were nearly 80 experts and representatives from East China Architectural Design Institute, Tongji University and other units. The person in charge of the company introduced the practical application and operation process of the new technology for reinforcing steel bars in the construction of high-rise buildings, subways, tunnels, bridges, etc., and made mechanical connection between steel reinforcement bars (Lenton Rebar Splice) and base steel bars.