无掩护状态下的高桩码头施工,受其施工过程中的自然环境条件(主要是风、浪及海冰)的影响,在工程施工过程中会遇到一系列新的技术问题。本文以天津港30万吨级原油码头工程建设为例,说明在无掩护状态下进行高桩码头施工过程中,针对这些技术问题需采取的施工方案和控制措施。
Under the condition of no cover, the construction of piled wharf will encounter a series of new technical problems during the process of construction due to the natural environmental conditions (mainly wind, waves and sea ice) during its construction. This paper takes the construction of Tianjin Port 300,000-ton crude oil terminal as an example to illustrate the construction scheme and control measures to be taken for these technical problems during the construction of piled wharf without cover.