复杂施工条件5层地下室一层半一逆作施工技术

来源 :施工技术 | 被引量 : 0次 | 上传用户:whitejet
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
厦门怡山商业中心共5层地下室,采用逆作法施工。根据现场场地狭窄等情况,开创性采用一层半一逆作的施工技术,即中间部分土方开挖深度为2层,四周土方开挖为1层,形成一层半一逆作的盆式土方开挖方法。详细介绍了复杂条件下地下连续墙、大直径逆作板墙深井扩底灌注桩、一层半一逆作、储土区域设专用提土设备及一个接力转土出土相结合、管网降压抗浮排水等关键技术,取得了良好的经济技术效益。 Xiamen Yishan Commercial Center, a total of 5 basements, the use of reverse construction. According to the scene of the site is narrow and so on, pioneering the use of a half-inverted construction technology, that is, the middle part of the earth excavation depth of 2 layers, earth excavation around the four layers to form a layer of semi-inverted pots earthwork Excavation method. This paper introduces in detail the underground continuous wall under complex conditions, the large diameter counter-sluice-wall deep well expanded bottom bored pile, the combination of one-half and one-in-the-reverse operation, the special earth-lifting equipment in the soil area and the unearthed one earth- Anti-floating drainage and other key technologies, and achieved good economic and technological benefits.
其他文献
厦门怡山商业中心塔楼共设大直径逆作板墙承压灌注桩24根,桩身直径2.4~3.2m,桩长50~60m,扩大头直径6.8m,单桩承载力32 000~51 000kN。结合工程地质条件,介绍了地下连续墙止水、
学位
通过工程实例 ,详细地介绍了某住宅楼倾斜的原因与纠偏加固施工方法 ,采用桩基托换用水平钻孔抽土纠偏 ,对基础沉降监测 ,施工后的监测结果表明纠偏方法是可行的、合理的。
论述了针对施工期为丰水期的降水方法 Discusses the precipitation for the wet period of construction methods