论文部分内容阅读
通过对襄樊北、徐州北、郑州北等典型编组站的研究分析,结合新建武汉北编组站的设计实践,提出双向纵列三级式编组站(三级七场)的设计要点,包括枢纽内车流集中作业,站址的选择,贯通正线与编组站的关系,两端疏解区的布置原则,编组站两端环到、环发线的运用,主要解编设备的选择,折角车流的处理,直通车的处理,直通列车增减轴作业,调车场尾部牵出线有效长等问题的处理。
Through the research and analysis of the typical marshalling stations in the north of North of Xiangfan, the north of Xuzhou and the north of Zhengzhou, combined with the design practice of the newly built Wuhan North Marshalling Station, the design essentials of two-way marshalling three-stage marshalling station Traffic concentration, site selection, through the relationship between the main line and the marshalling yard, the layout of the two ends of the solution area, marshalling stations at both ends of the loop, the use of the ring line, the main choice of equipment, equipment, folding car flow treatment , Through train handling, train passing through the axis of the job, the end of the yard pull-out line effective long and other issues of treatment.