一、序言在兴建或改造电碳企业时,需要考虑投资规模、主导产品的品种和产量、工艺流程设计、工厂布局规划、主体车间和辅助车间设计、主要设备及辅助设备的配置以及工人和技术人员的配备等各个方面,它是一个很大的系统工程,由硬件和软件组成,也包括测试机构的设计,不过,有关这方面的论述未见报道。本文通过对国内现有电碳企业测试机构的调查研究,在翔实的统计数据基础上,对电碳企业测试机构的模式、组织体系、测试项目、技术文件及标准、人
I. INTRODUCTION When constructing or transforming an electric carbon enterprise, it is necessary to consider the scale of investment, variety and production of leading products, process design, plant layout planning, design of main workshops and auxiliary workshops, configuration of major equipment and auxiliary equipment, and workers and technologies. In terms of staffing and other aspects, it is a large system project consisting of hardware and software, as well as the design of test institutions. However, no discussion has been reported on this aspect. In this paper, through the investigation and research of existing domestic electric carbon enterprise testing organizations, based on detailed statistical data, the model, organization system, test items, technical documents and standards of the testing organizations of electric carbon enterprises, and