黄登大华桥砂石加工系统建成投运后,在高峰期运行中发现料场料源变化大、细骨料石粉含量不稳定、粗骨料裹粉严重、甸尾料仓调节能力不足、中石供应紧张等,建管局通过组织现场调研、邀请专家咨询、召开专题会等举措,对系统进行改造和优化,从而使系统达到最优运行状态,骨料质量得到提升,保证骨料正常供应。满足了黄登、大华桥两水电站高峰期生产要求,为黄登、大华桥两座水电站工程建设顺利推进打下了良好的基础。
Huangdao Dahua Bridge gravel processing system put into operation, found during the peak operation of material changes in the material field is large, fine aggregate powder content is not stable, coarse grained flour serious Austin tail silo conditioning capacity is insufficient, China Stone, such as tight supply, the Authority through the organization of on-site research, invite experts to consult, hold special sessions and other initiatives to transform and optimize the system, so that the system to achieve optimal operation of the aggregate quality has been improved to ensure the normal supply of aggregate . The Huangdon and Dahua Bridge hydropower stations have met the peak production requirements, laying a good foundation for the smooth progress of the construction of Huangdon and Dahuaqiao Hydropower Plants.