在矿井提升系统安装结束、正式投入使用前,应对矿井提升机进行调试和试运转,通过检测以判断系统是否达到预期的设计目标。文章以2JK-3/11.5型提升机为例,介绍了矿井提升机的调试与试运转具体方法及步骤。
In the mine hoist system installation is completed, put into use before the mine hoist should be debugged and commissioning, testing to determine whether the system to achieve the desired design goals. Taking the 2JK-3 / 11.5 hoist as an example, the article introduces the concrete method and steps of debugging and commissioning of mine hoist.