水压机车间中锻造吊车主、付钩位置和锻造操作机位置的安排,通常可以分为四种形式。现在拟将每一种布置的优缺点,加以分析。第一种布置方式第一种布置方式如图1所示,锻造吊车和锻造操作机的主要操作位置都在热处理爐这一端。如操作时须采用锻造吊车,则锻造工序为: 1.首先用运输吊车将红热鋼錠送过水压机到热处理爐这一端,因为锻造吊车的主钩操作位置靠近热处理爐这一边(图2箭头所示为运输吊车带着红热鋼錠的运输路线),此时锻造吊车主钩带着翻料机后退(操作机当然要退得更远一些),以便讓出位置给运输吊车将钢錠送到热处理爐这一端。当运输吊车将钢
Hydraulic workshop forging crane owner, pay the hook position and the location of the forging manipulator can usually be divided into four forms. It is now proposed to analyze the advantages and disadvantages of each arrangement. The first arrangement The first arrangement shown in Figure 1, forging crane and forging operation of the main operating position in the heat treatment furnace at this end. If the operation requires the forging crane, the forging process is as follows: 1. Firstly, the red hot steel ingot is transported by the transport crane to the end of the heat treatment furnace because the main hook of the forged crane is located close to the heat treatment furnace side Shown as transport cranes with red hot steel ingot transport route), then forged crane main hook with the tumbler back (the operating machine of course to retreat farther), in order to give way to the transport crane to the ingot to Heat treatment furnace at this end. When transporting the crane will be steel