冬期施工虽不常发生,但如果发生不提前准备和防范,会影响工程质量、进度,控制措施不当会给工程质量带来隐患,因此,在工程即将进入冬期前作好防范,在施工期间作好控制是必要的,是保证工程的质量及施工进度。我国冬季气温非常寒冷,尤其是我国大部的北方地区,整个冬季都会在零下度过。在如此严寒的温度下施工的难度不言而喻,很多建筑用材的保管难度、商用混凝土的制造及运输难度、材料的运送难度、钢筋焊接的难度、砌筑难度都非常大。所以,在这种环境的下施工,一定要采取一些特殊的施工防护措施,以保证工程的正常施工。现针对冬季房建施工技术控制管理措施进行了简要的探讨。
Although the winter construction does not happen often, if it does not occur in advance, it will affect the quality and progress of the project. Improper control measures will bring hidden dangers to the project quality. Therefore, before the project is about to enter the winter, be prepared and ready for construction Control is necessary, is to ensure the quality of the project and construction progress. China’s winter temperatures are very cold, especially in most of northern China, the entire winter will be spent in minuscule. The difficulty of construction in such a cold temperature is self-evident, a lot of construction materials storage difficulty, commercial concrete manufacturing and transportation difficulties, the difficulty of material delivery, the difficulty of steel welding, masonry are very difficult. Therefore, under the construction of this environment, we must take some special construction protection measures to ensure the normal construction of the project. A brief discussion is made on winter building control measures.