黄河河套灌区自三盛公水利枢纽建成(1961年)后,解决了灌区引水问题。经过30年的配套建设,基本完成了灌溉渠系与主要建筑物。70年代中至80年代开始了以排水为重点的灌排配套。1987年作为中国北方灌溉项目,引进了世界银行资金,对排水系统进行了扩建和改造。处于灌区下游的红圪卜排水站是全灌区排水系统汇集的总出口,是排水的关键;原仅有一座30m~3/s的排水泵站,根据扩建设计要求将工程规模扩大为100m~3/s。由于流量大、扬程低,加之地基为粉细砂,施工排水非常困难。排水大井深度只能在20m以内,国内厂家尚无合适泵型可
The Hetao Irrigation District of the Yellow River solved the water diversion problem in the irrigation area since the completion of the Shengshengong Water Control Project (1961). After 30 years of supporting construction, basically completed irrigation canal system and major buildings. From the mid-1970s to the 1980s, irrigation and drainage facilities focused on drainage were started. In 1987, as an irrigation project in northern China, the World Bank introduced funds to expand and rehabilitate the drainage system. In the lower reaches of the irrigated area, the Hongjubu Drainage Station is the total outlet pooling the drainage system of the whole irrigation area and is the key to drainage. Originally, there was only one drainage pumping station of 30m ~ 3 / s, which was expanded to 100m ~ 3 / s. Due to large flow, low head, combined with the foundation for the fine sand, construction drainage is very difficult. Drainage well depth can only be less than 20m, the domestic manufacturer is not suitable pump type can be