吉林松江河水力发电有限责任公司是国网新源控股有限公司全资子公司,承担着小山、双沟、石龙三座常规水电站510兆瓦装机容量和松山引水工程的运行管理任务,工程于1990年开始筹建、2010年全部投产发电。公司经历了筹建、基建、基建转生产和单纯的生产管理各个阶段,工作中始终坚持用法治方式解决发展中的问题,推动了公司各项管理工作水平不断提升。
Jilin Songjianghe Hydropower Co., Ltd. is a wholly-owned subsidiary of State Grid Xinyuan Holding Co., Ltd., undertaking the 510MW installed capacity of the three conventional hydropower stations in Xiaoshan, Shuangou and Shilong and the operational management of the Songshan Diversion Project. Construction began in 1990, all put into production in 2010. The company has gone through various stages of preparation and construction, infrastructure construction, infrastructure transformation and production management, and simple production management. In the course of its work, the Company always adhered to the rule of law to solve the problems in development and promoted the continuous improvement of various management work of the Company.