论文部分内容阅读
解放几年来山地工作有了很大发展,特别是在今后全民办地质事业的形势下,小型矿床实行边探边采,勘探坑道与开采坑道综合利用的要求下,山地工作的任务必然增大,工程的复杂性亦随之增大。因此在施工前就需要有一比较完整的技术设计,在设计中如何能结合地质勘探的特点,对生产指导的作用更大,也就是如何又多、又快、又好、又省的完成山地工作任务,是值得我们大家讨论的。现就地质部系统山地工作技术设计中所看到的几个问题,提出来和作设计的同志们商讨。
In recent years, there has been a great development in mountain work. In the future, under the condition of fully-run geology and geology, the task of mountain work must inevitably increase under the requirement of comprehensive utilization of edge excavation, exploration tunnel and mining tunnel in small deposits, The complexity of the project also increases. Therefore, it is necessary to have a comparatively complete technical design prior to construction. How to combine the characteristics of geological exploration in design to make a greater contribution to the production guideline, that is, how to improve the mountainous area quickly, well and economically The task is worth our discussion. Here are a few problems we have seen in the technical design of mountainous work in the Department of Geology, which we propose to discuss with comrades who are designing.