本文根据鞭金矿的矿体赋存和开采技术特点,论述了规模为500~1000t/d、提升高度为400~600m的矿山开拓提升方案的选择要点,分析介绍了提升系统主要参数的无因次系数法运用,可供类似矿山工程设计参考。
Based on the characteristics of orebodies occurrence and mining in Bipin Gold Mine, the paper points out the key points for selecting a mine expansion project with the scale of 500 ~ 1000t / d and the lifting height of 400 ~ 600m, analyzes and introduces the reasons why the main parameters of the system are promoted Sub-coefficient method used for similar mine engineering design reference.