印江岩口抢险工程位于贵州省印江土家族苗族自治县境内.1996年9月18日在印江县上游印松公路1.1km 处,峨岭镇岩底村岩口处发生特大型牵引式深层基岩滑坡,阻塞印江河,造成河水位上涨,形成汇塞湖,引发了灾害。灾情发生后,贵州省政府委托,由省水利电力厅牵头组织专家组,提出了岩口抢险工程的应急整治方案,其中包括修建1号隧洞.由于1号隧洞开挖是在形成汇塞湖情况下进行的,而进口位于水下30m。为此,经研究确定了进口采用水下岩塞爆破方案施工。1号隧洞总长702.493m,开挖洞径7×7m,上游水位513m 时,相应泄流量为364m~3/s。岩塞区地层为下三迭系夜郎组玉龙小灰岩,岩性以厚层为主夹薄层
Yankou Yankou rescue project is located in the territory of Guizhou Province Tujia and Miao Autonomous County .In September 18, 1996 in Yinjiang upstream Yinsong Highway 1.1km Department, Ya Lingzhen rock village at the mouth of a large traction deep Bedrock landslide, blocking the Indian River, causing the river water level rise, the formation of the sinks Lake, triggered a disaster. After the disaster, Guizhou provincial government commissioned by the provincial Water Resources and Electric Power Department led a group of experts, put forward the emergency rescue project Iwakuni remediation programs, including the construction of No. 1 tunnel because the No. 1 tunnel excavation is the formation of the Lake Under the import, while the import is located 30m underwater. To this end, the study identified the use of underwater rock plug blasting program construction. The total length of No. 1 tunnel is 702.493m, the excavation diameter is 7 × 7m and the upstream water level is 513m. The corresponding discharge amount is 364m 3 / s. The rock block zone is the Yelong Formation Yelong Small Limestone in the Lower Triassic series with lithology dominated by thick layers