论文部分内容阅读
一、高填路堤整平压实方法、质量标准为保证工程施工质量,确保高填土路基稳定,控制路基下沉量,在施工过程中,每道工序必须严格控制施工质量,必须提高质量控制标准,并按以下方法控制施工。
I. High Embankment Leveling Compaction Method and Quality Standard In order to ensure the construction quality, ensure the stability of high fill roadbed and control the subsidence, the quality of construction must be strictly controlled in every process during construction Standard, and the following methods to control the construction.