论文部分内容阅读
什邡市乡镇集体个体矿山企业90个,其中煤矿81个,设计生产能力60万吨;石灰石矿6个,设计生产能力60万吨,磷矿2个,设计生产能力5万吨;粘土矿1个,设计生产能力2万吨。集中在山区三个乡镇。采矿点布置密集,生产技术落后,劳动生产率低下。针对这种状况,本人就如何贯彻落实《中华人民共和国矿产资源法》和全国储委颁发的关于《县办国有及乡镇集体小矿矿产储量审批若干规定》的要求,加强小矿开发过程中的矿产储量管理,为市场经济的发展提供决策依据,实现矿业秩序的全面好转等实际工作中涉及的问题谈点个人的意见。一、乡镇集体、个体小矿山企业现状1.点多面广,规划失控在“有水快流”思想指导下,1992年以
Shifang township collective individual mining enterprises 90, of which 81 coal mines, design and production capacity of 600,000 tons; limestone mine 6, the design production capacity of 600,000 tons, two phosphate rock, designed production capacity of 50,000 tons; a clay mine , Design production capacity of 20,000 tons. Concentrated in the three townships in the mountains. Dense mining layout, backward production technology, labor productivity is low. In response to this situation, I on how to implement the “Mineral Resources Law of the People’s Republic of China” and the National Committee of the State Council on the issue of “state-owned and township collective small ore reserves approved a number of regulations,” the requirements to strengthen the development of small mines Management of mineral reserves, provide decision-making basis for the development of market economy, and realize the overall improvement of the mining order and other issues involved in practical work to talk about individual opinions. First, the township collective, individual small mining enterprises status 1. Point wide range of planning out of control In the “fast water flow” under the guidance of the idea of