摘要:蒸压加气混凝土砌块是目前一种比较成熟的轻质墙体材料,它以其自身的良好性能,适应了当前墙体改革的需要,因而得以在工业与民用建筑中推广使用。本文主要针对上述存在的问题,介绍工程蒸压加气混凝土砌块在砌筑前及施工中采取有效的质量控制措施,有效地控制了缺陷的发生,确保了工程质量。
关键词:蒸压加气混凝土砌块;施工质量;砌筑工艺要求
Abstract: the autoclaved aerated concrete block is currently a mature light wall material, and it with his own good performance, to adapt to the current wall reform need, therefore been able to in industrial and civil architecture to promote the use of. This article mainly aims at the above the existent problems and introduces engineering the autoclaved aerated concrete block before and during laying in the construction quality control measures to take effective, effectively control the occurrence of the defect, ensure the engineering quality.
Key words: the autoclaved aerated concrete block; Construction quality; Laying process requirements
中圖分类号: TV528 文献标识码:A文章编号:
引言
加气混凝土砌块在用普通砂浆砌筑时,由于砂浆失水过快,灰缝不易饱满填实,砂浆养护不足,造成砂浆强度降低,甚至粉化疏松,导致砌块沿灰缝开裂,该种裂缝主要发生在房屋顶层,在山墙上出现水平方向裂缝,端部内横墙和内纵墙上出现八字裂缝。本文从以下几个方面探讨蒸压加气混凝土砌筑施工质量控制要点。
1、选用材料的要求
首先,从选材上要严格控制。为保证质量,应选取生产工艺成熟,养护条件好的厂家产品;尽量选择07级以上或抗压强度等级不低于5Mpa的产品,强度越高,其材料的密实度越好,一般来说,干燥收缩值也会减小;所选用的加气混凝土砌块的干燥收缩值要求不大于0.5mm/m,必须保证有28天的养护期,才能上墙砌筑。由于通常加气混凝土砌块出釜5-7天的收缩率约占了总收缩的50%,如能保证在出釜28天以后才投入使用的话,则可大大减少因为干缩引起裂缝的机会。砌块进场后,要做好防雨措施。施工时砌块不宜露天堆放,尤其在春、夏两季,应堆放在有遮盖的地方;如条件所限只能在露天堆放时,应堆放在地势较高的地方,做好排水处理。有条件的单位可以选用加气砌筑粘结剂进行砌体施工,加气砌筑粘结剂是以高分子聚合物和水硬性硅酸盐材料为主,配以多种高性能助剂合理配置而成的粉体材料。使用该产品时,按粉料与水的比例,4:1的配比搅拌至无结块、无沉淀、均匀的浓稠状,施工时用专用工具(刮勺或齿形泥板)将料浆刮在所需砌筑的材料上,然后将砌块放在需要的部位,适当用力排放整齐即可。经过反复的实验证明,加气混凝土粘结剂它的粘结强度高,具有良好的保水性能,经水化反应后能与加气混凝土有较大的粘附力,耐候性能好且不龟裂、剥落、与不同基层具有良好的粘结力,克服了普通砂浆的粘结不牢,开裂等缺点。
抹灰砂浆强度应与墙体材料强度相适应,外墙、厨厕等有防水要求的位置应采用防水砂浆。墙体与混凝土交界处宜加挂防裂网,外墙部分满挂网。可以在外(内)墙抹灰砂浆中加入杜拉纤维等材料,改善砂浆的抗裂、抗渗性能。抹灰前必须先进行基层界面处理。墙面抹灰应分次成活,每次厚度在8mm左右。
2砌体施工
(1)砌块砌筑时,应提前1d向砌块面适量洒水,不得多浇,湿润砌块渗入表层一般以0.8~1.2cm为宜,砌筑时砌块的含水率应控制在15%~20%,以保证砌块间的粘结,炎热干燥时可适当洒水阴干8h再砌筑。砌筑时应上下错缝,搭接长度不宜小于砌块长度的1/3。
(2)砌筑砌块时灰缝应横平竖直,砂浆饱满,垂直缝宜用内外临时夹板灌缝。水平灰缝厚度不得大于15mm,垂直灰缝宽度不得大于20mm,可用双面闸板灌缝。
(3)切锯砌块应采用专用锯,不得用瓦刀和斧子任意砍劈。门窗洞口两侧应选用规则整齐的砌块砌筑。
(4)本工程每层楼高为3~3.4m,每层在砌筑到1m高度时,在砌块水平灰缝中放2Ф6钢筋。该灰缝用M10水泥砂浆砌筑,灰缝厚20mm。待次日再砌筑上部砌块,砌筑到2m高度时,再放2Ф6钢筋在水平灰缝中,次灰缝也用M10水泥砂浆砌筑,灰缝厚20mm。当砌至离梁底200~250mm时暂停砌筑,隔1d再用砌块斜竖砌筑剩余高度,以保证砌块与梁底灰缝饱满,不留空隙。每天控制砌筑砌体高度的目的是避免砌体收缩、变形过大而产生裂缝,尽量留出时间让砌块本身和灰缝收缩变形稳定。
(5)由于砌体吸水率低,吸水速度慢,砌体完工后7d方可进行抹灰工作。在抹灰前应先将基层处理干净,如先涂1~2mm厚掺5%稀释底107胶素水泥浆,在其凝固前随即采用与加气混凝土强度接近底混合砂浆进行找平抹灰,防止空鼓开
裂。抹灰层一次抹灰厚度不超过10mm,如抹灰层较厚应分层抹,抹灰总厚度在
15mm以内。
(6)砌筑外墙时,外墙抹灰后贴饰面砖,防止水渗入墙内。
3砌筑质量控制
(1)砌筑时不得使用出釜龄期不足、破裂、不规整、浸水或表面被污染的砌块。对破裂和不规整的砌块可切割成小规格后使用。
(2)砌筑时,应上下错缝,搭接长度不宜小于砌块长度的1/3,且不小于150mm。1不同材料基位置相邻3皮的搭接长度不能满足上述要求时,应在每皮水平缝内设置不少于2φ6钢筋,钢筋两端均应超过该垂直缝350mm处。
(3)灰缝应横平竖直,水平灰缝和垂直灰缝的厚度均不宜大于15mm。水平缝砂浆饱满度不应小于90%,垂直缝砂浆饱满度不应小于80%
。
(4)砌体的转角处和交接处应同时砌筑。对不能同时砌筑而又必须留置临时间断处,应砌成斜搓,斜搓水平投影不应小于砌体高度。接楼时,应先清理基面,烧水润湿,然后用相同材料接砌。
(5)砌体应分次砌筑,每次连续砌筑高度不应超过1.5m,应待前次砌筑的砂浆终凝后,再继续砌筑:日砌筑高度不宜大于2.4m。
(6)砌至接近梁、板底时,建议预留40~60mm的空隙,至少问隔7天后加100mm(长)×100mm(宽)×10~50mm(高)@600(间距)防腐木棋,模紧后用微膨胀砌筑砂浆灌实。
(7)墙体留置临时施工洞口,其侧边离交接处墙面不应小于500mm,洞口净宽度不应超过1m。洞口两侧应沿墙高每隔500~600mn在水平雄内预埋不少于2φ6的钢筋,钢筋埋入长度从留楼处算起,每边均不应小于700mm。洞口顶部设计无规定时,宜设置过梁。
(8)砌筑门窗洞时,应按设计标高将预制钢筋混凝土过梁(正确方向)牢固砌入。采用现浇钢筋混凝土过梁时,混凝土强度未达到设计要求的70%以上时,不得拆除过梁底部的支撑和模板。
4墙体抹面施工质量控制
(1)墙面抹灰应在砌体工程完毕至少7d且经验收合格后进行,应
先将墙面基层清理干净,墙体上的灰缝、孔洞填补密实。刷一层专用
界面剂作为结合层,并根据产品要求的间隔时间进行抹灰。
(2)梁、柱、剪力墙等混凝土与砌体交接部位及水电管线安装部
位,其变形参数相差较大,采用了耐碱玻纤网格布作为加强网,防止
墙体收缩引起开裂。
(3)抹灰前将墙面适度湿润,抹基层灰时必须用力,并使表面粗糙,
以利于面层砂浆的粘结。待基层砂浆凝结后应用水润湿,然后抹第二
层砂浆,两层抹灰间隔时间不得少于10h,两层抹灰不在同1d内进行。
(4)挂加强网时应先清洁基层,除去浮灰油污,修补整平墙面,保
持一定湿度。挂网应展平,用射钉固定牢固,网材搭接平整、搭接长度
大于100mm。挂网面置于抹灰层内,防止受腐蚀。
结束语
加气混凝土砌块在工程建设中应用越来越广泛,但对于砌块施工过程中容易出现的诸如墙体裂缝、抹灰层空鼓等现象应采取有力措施工质量。
参考文献
[1]GBl5762—1995蒸压加气混凝土砌块板
[2]蒸压加气混凝土砌块GBl1968—2006
[3]砌体工程施工质量验收规范GB50203—2002
注:文章内所有公式及图表请以PDF形式查看。
关键词:蒸压加气混凝土砌块;施工质量;砌筑工艺要求
Abstract: the autoclaved aerated concrete block is currently a mature light wall material, and it with his own good performance, to adapt to the current wall reform need, therefore been able to in industrial and civil architecture to promote the use of. This article mainly aims at the above the existent problems and introduces engineering the autoclaved aerated concrete block before and during laying in the construction quality control measures to take effective, effectively control the occurrence of the defect, ensure the engineering quality.
Key words: the autoclaved aerated concrete block; Construction quality; Laying process requirements
中圖分类号: TV528 文献标识码:A文章编号:
引言
加气混凝土砌块在用普通砂浆砌筑时,由于砂浆失水过快,灰缝不易饱满填实,砂浆养护不足,造成砂浆强度降低,甚至粉化疏松,导致砌块沿灰缝开裂,该种裂缝主要发生在房屋顶层,在山墙上出现水平方向裂缝,端部内横墙和内纵墙上出现八字裂缝。本文从以下几个方面探讨蒸压加气混凝土砌筑施工质量控制要点。
1、选用材料的要求
首先,从选材上要严格控制。为保证质量,应选取生产工艺成熟,养护条件好的厂家产品;尽量选择07级以上或抗压强度等级不低于5Mpa的产品,强度越高,其材料的密实度越好,一般来说,干燥收缩值也会减小;所选用的加气混凝土砌块的干燥收缩值要求不大于0.5mm/m,必须保证有28天的养护期,才能上墙砌筑。由于通常加气混凝土砌块出釜5-7天的收缩率约占了总收缩的50%,如能保证在出釜28天以后才投入使用的话,则可大大减少因为干缩引起裂缝的机会。砌块进场后,要做好防雨措施。施工时砌块不宜露天堆放,尤其在春、夏两季,应堆放在有遮盖的地方;如条件所限只能在露天堆放时,应堆放在地势较高的地方,做好排水处理。有条件的单位可以选用加气砌筑粘结剂进行砌体施工,加气砌筑粘结剂是以高分子聚合物和水硬性硅酸盐材料为主,配以多种高性能助剂合理配置而成的粉体材料。使用该产品时,按粉料与水的比例,4:1的配比搅拌至无结块、无沉淀、均匀的浓稠状,施工时用专用工具(刮勺或齿形泥板)将料浆刮在所需砌筑的材料上,然后将砌块放在需要的部位,适当用力排放整齐即可。经过反复的实验证明,加气混凝土粘结剂它的粘结强度高,具有良好的保水性能,经水化反应后能与加气混凝土有较大的粘附力,耐候性能好且不龟裂、剥落、与不同基层具有良好的粘结力,克服了普通砂浆的粘结不牢,开裂等缺点。
抹灰砂浆强度应与墙体材料强度相适应,外墙、厨厕等有防水要求的位置应采用防水砂浆。墙体与混凝土交界处宜加挂防裂网,外墙部分满挂网。可以在外(内)墙抹灰砂浆中加入杜拉纤维等材料,改善砂浆的抗裂、抗渗性能。抹灰前必须先进行基层界面处理。墙面抹灰应分次成活,每次厚度在8mm左右。
2砌体施工
(1)砌块砌筑时,应提前1d向砌块面适量洒水,不得多浇,湿润砌块渗入表层一般以0.8~1.2cm为宜,砌筑时砌块的含水率应控制在15%~20%,以保证砌块间的粘结,炎热干燥时可适当洒水阴干8h再砌筑。砌筑时应上下错缝,搭接长度不宜小于砌块长度的1/3。
(2)砌筑砌块时灰缝应横平竖直,砂浆饱满,垂直缝宜用内外临时夹板灌缝。水平灰缝厚度不得大于15mm,垂直灰缝宽度不得大于20mm,可用双面闸板灌缝。
(3)切锯砌块应采用专用锯,不得用瓦刀和斧子任意砍劈。门窗洞口两侧应选用规则整齐的砌块砌筑。
(4)本工程每层楼高为3~3.4m,每层在砌筑到1m高度时,在砌块水平灰缝中放2Ф6钢筋。该灰缝用M10水泥砂浆砌筑,灰缝厚20mm。待次日再砌筑上部砌块,砌筑到2m高度时,再放2Ф6钢筋在水平灰缝中,次灰缝也用M10水泥砂浆砌筑,灰缝厚20mm。当砌至离梁底200~250mm时暂停砌筑,隔1d再用砌块斜竖砌筑剩余高度,以保证砌块与梁底灰缝饱满,不留空隙。每天控制砌筑砌体高度的目的是避免砌体收缩、变形过大而产生裂缝,尽量留出时间让砌块本身和灰缝收缩变形稳定。
(5)由于砌体吸水率低,吸水速度慢,砌体完工后7d方可进行抹灰工作。在抹灰前应先将基层处理干净,如先涂1~2mm厚掺5%稀释底107胶素水泥浆,在其凝固前随即采用与加气混凝土强度接近底混合砂浆进行找平抹灰,防止空鼓开
裂。抹灰层一次抹灰厚度不超过10mm,如抹灰层较厚应分层抹,抹灰总厚度在
15mm以内。
(6)砌筑外墙时,外墙抹灰后贴饰面砖,防止水渗入墙内。
3砌筑质量控制
(1)砌筑时不得使用出釜龄期不足、破裂、不规整、浸水或表面被污染的砌块。对破裂和不规整的砌块可切割成小规格后使用。
(2)砌筑时,应上下错缝,搭接长度不宜小于砌块长度的1/3,且不小于150mm。1不同材料基位置相邻3皮的搭接长度不能满足上述要求时,应在每皮水平缝内设置不少于2φ6钢筋,钢筋两端均应超过该垂直缝350mm处。
(3)灰缝应横平竖直,水平灰缝和垂直灰缝的厚度均不宜大于15mm。水平缝砂浆饱满度不应小于90%,垂直缝砂浆饱满度不应小于80%
。
(4)砌体的转角处和交接处应同时砌筑。对不能同时砌筑而又必须留置临时间断处,应砌成斜搓,斜搓水平投影不应小于砌体高度。接楼时,应先清理基面,烧水润湿,然后用相同材料接砌。
(5)砌体应分次砌筑,每次连续砌筑高度不应超过1.5m,应待前次砌筑的砂浆终凝后,再继续砌筑:日砌筑高度不宜大于2.4m。
(6)砌至接近梁、板底时,建议预留40~60mm的空隙,至少问隔7天后加100mm(长)×100mm(宽)×10~50mm(高)@600(间距)防腐木棋,模紧后用微膨胀砌筑砂浆灌实。
(7)墙体留置临时施工洞口,其侧边离交接处墙面不应小于500mm,洞口净宽度不应超过1m。洞口两侧应沿墙高每隔500~600mn在水平雄内预埋不少于2φ6的钢筋,钢筋埋入长度从留楼处算起,每边均不应小于700mm。洞口顶部设计无规定时,宜设置过梁。
(8)砌筑门窗洞时,应按设计标高将预制钢筋混凝土过梁(正确方向)牢固砌入。采用现浇钢筋混凝土过梁时,混凝土强度未达到设计要求的70%以上时,不得拆除过梁底部的支撑和模板。
4墙体抹面施工质量控制
(1)墙面抹灰应在砌体工程完毕至少7d且经验收合格后进行,应
先将墙面基层清理干净,墙体上的灰缝、孔洞填补密实。刷一层专用
界面剂作为结合层,并根据产品要求的间隔时间进行抹灰。
(2)梁、柱、剪力墙等混凝土与砌体交接部位及水电管线安装部
位,其变形参数相差较大,采用了耐碱玻纤网格布作为加强网,防止
墙体收缩引起开裂。
(3)抹灰前将墙面适度湿润,抹基层灰时必须用力,并使表面粗糙,
以利于面层砂浆的粘结。待基层砂浆凝结后应用水润湿,然后抹第二
层砂浆,两层抹灰间隔时间不得少于10h,两层抹灰不在同1d内进行。
(4)挂加强网时应先清洁基层,除去浮灰油污,修补整平墙面,保
持一定湿度。挂网应展平,用射钉固定牢固,网材搭接平整、搭接长度
大于100mm。挂网面置于抹灰层内,防止受腐蚀。
结束语
加气混凝土砌块在工程建设中应用越来越广泛,但对于砌块施工过程中容易出现的诸如墙体裂缝、抹灰层空鼓等现象应采取有力措施工质量。
参考文献
[1]GBl5762—1995蒸压加气混凝土砌块板
[2]蒸压加气混凝土砌块GBl1968—2006
[3]砌体工程施工质量验收规范GB50203—2002
注:文章内所有公式及图表请以PDF形式查看。