论文部分内容阅读
国务院总理李鹏20日和21日先后考察了东北滨海水电大件加工厂、渤海造船厂和绥中发电厂。李鹏指出,今后国民经济的发展,关键在于转变经济的增长方式。制造企业要把重点放在现有企业的挖潜改造上,要根据国内外市场的需求,充分发挥现有的生产能力,依靠科技进步和加强企业管理,切实提高制造水平和开发能力。 李鹏要求我国两大水电设备制造企业哈尔滨电站设备成套公司和东方电气集团公司,通过内外结合,联合设计,合作制造,消化吸收引进技术,同时进行必要的技术改造,提高我国水电没备的设计制造水平,为三峡工程提供世界一流的特大型电机组,提
On the 20th and 21st, Premier Li Peng of the State Council inspected the large-scale northeastern seawater processing plant, the Bohai Shipyard and the Suizhong Power Plant. Li Peng pointed out that the key to the development of the national economy in the future lies in changing the mode of economic growth. Manufacturing enterprises should focus on the potential tapping and transformation of existing enterprises. We must fully utilize existing production capacity according to the needs of domestic and foreign markets, rely on scientific and technological advancement and strengthen corporate management, and earnestly improve manufacturing and development capabilities. Li Peng asked Harbin Power Station Equipment Manufacturing Company and Dongfang Electric Corporation, two major hydropower equipment manufacturers in China, to combine domestic and foreign production, jointly design, and manufacture, digest and absorb imported technology, and carry out necessary technological transformation to improve the design and manufacture of China’s hydropower equipment. At the same level, it provides a world-class ultra-large electric machine for the Three Gorges Project.