大朝山电站大江截流工作已于1997年11月10日进行。世纪之交时,正值云南缺电的高峰期,特别是枯水期,为保证全省经济快速、持续、健康发展,不受电力瓶颈的影响。大朝山有限责任公司充分发挥现代企业制度的优势,在筹建工作取得显著成绩的基础上,充分组织并调动所有参加大朝山工程建设的单位和建设者们以一流的工程质量和只争朝夕的精神,争取第一台机组能在2001年枯水期到来之前开始发电,为云南省下世纪初的经济建设作出具有历史意义的贡献。 自1995年漫湾电站一期工程I25万kW全部建成发电之后,面临云南省国民经济每年有10%速度持续发展的用电需要,必须抓紧开发新的大型发电工程。经权威机关论证,认为在“九五”和“十
The closure of the Dachaoshan Hydropower Station was completed on November 10, 1997. At the turn of the century, it was at the peak of power shortage in Yunnan, especially during the dry season. In order to ensure rapid, sustained, and healthy economic development of the province, it was not affected by the power bottleneck. Dachaoshan Co., Ltd. gives full play to the advantages of modern enterprise systems, and on the basis of remarkable achievements in the preparatory work, fully organizes and mobilizes all units and constructors participating in the construction of the Dachaoshan Project with first-class engineering quality and the spirit of rushing to the eve of the day. To strive for the first unit to start generating electricity before the dry period in 2001, and to make a historic contribution to Yunnan’s economic construction in the early next century. Since the completion of the 150,000-ton project of the Manwan Hydropower Station Phase I project in 1995, it is faced with the need for electricity to continue to develop at a rate of 10% per year in Yunnan’s national economy. We must step up efforts to develop new large-scale power generation projects. Demonstrated by the authoritative organ, considered in the “Ninth Five-Year Plan” and "Ten