我所承担系统技术总体和核心设备的野战网一期工程,9月25日在北京通过国家军工通信产品定型委员会鉴定,移交部队试用。野战网一期工程从立项到今年第一季度,大多数设备已完成设计定型前的工作,同时经过多次局部和系统联试,今年4月至7月在石家庄地区完成了第二次系统联试。对系统的功能、性能测试表明,系统的技术性能已达到设计指标。今年8月初,一期工程的设备运往北京地区,开始了部队试验。进行了初步模拟战术运用,
The first phase of the field network project, which I was responsible for overall system technology and core equipment, was identified in Beijing on the 25th of September by the National Military Communication Products Steering Committee and transferred to the troops for trial. The first phase of the field network project from the establishment of the project to the first quarter of this year, most of the equipment has been completed before the finalization of the design work, at the same time after several partial and system joint test, this year in April to July in Shijiazhuang completed the second system of joint test. The function and performance test of the system shows that the technical performance of the system has reached the design index. In early August of this year, the equipment for the first phase of the project was shipped to the Beijing area and the trial of troops began. A preliminary simulation of tactical use was conducted.