论文部分内容阅读
介绍广州市轨道交通五号线[猎德站]车站主体的中板纵梁的高支模的施工情况,以及支模系统受力验算。
This paper introduces the construction of the high-rise formwork of the slab of the central slab of Guangzhou Rail Transit Line 5 [Liede Railway Station] station, and the checking of the force of the mold-supporting system.