钢筋混凝土桥梁的上部构造,目前所采用的多层贴式防水层,实质上仍停留在建造最初的钢筋混凝土桥梁时所采用的防水层一样,那时是采用低标号的110—140混凝土,而行车道部分的路面铺砌层便建造在砂质垫层上。铺设贴式防水层是费力的,不能机械化施工,而又必须在干燥天气的一定温度下进行。按照铺设防水层的规程指示,每一层防水层的干燥和凝结时间约需16日,而铺设防水层的工作时间尚未计算在内。为了使桥梁能迅速地交付使用,建筑者常常违背防水层的铺设规定,没有遵照指示中规定的期限,铺设防水层也不符合质量要求,因此防水层就没有完成它的使命。
The upper structure of the reinforced concrete bridge, the multilayer waterproofing layer currently used, remains essentially the same waterproofing layer used in the construction of the original reinforced concrete bridges, when low grade 110-140 concrete is used, Road pavement paving layer will be built on the sand cushion. Laying waterproof layer paste is laborious, can not be mechanized construction, but must be carried out at a certain temperature in dry weather. According to the instruction of laying waterproofing layer, the drying and setting time of each waterproof layer is about 16 days, and the working time of laying waterproof layer has not been included. In order for the bridge to be delivered quickly, builders often violate the laying of waterproofing pavements, fail to comply with the deadlines set forth in the instructions, lay waterproofing layers that do not meet quality requirements, and waterproofing layers do not fulfill their mission.