摘要:市政给排水工程作为城市基础设施工程中的重要组成部分,不仅需要满足城市规划的纵深度,还要保证具有良好的城市服务功能,满足工业、日常生活等方面的服务要求。笔者根据几年来从事市政给排水工程资料整理工作的经验,以提高市政给排水工程的城市服务能力为目的,初步探讨了其在施工过程中加强质量管理与控制的有效措施。
关键词:市政给排水工程;质量管理
Abstract: Municipal water supply and drainage engineering as an important part of city infrastructure construction, not only need to meet the depth of city planning, but also to ensure the good city service functions, meet the industry, daily life and other service requirements. According to several years working experience in municipal consolidation drainage engineering data, in order to improve the urban water supply and drainage project of the city service ability, discusses the effective measures to strengthen the management and quality control in the construction process.
Key words: municipal water supply and drainage engineering; quality management
中圖分类号:TU992 文献标识码: A文章编号:2095-2104(2012)01-0020-02
为了满足我市地下管道网络建设的科学性与合理性,有必要针对市政给排水工程施工过程中的质量管理问题提出加强措施,全面提高供水、排水能力,减少城市路段损坏、输电线路损坏等。不仅有利于减少经济损失,也有利于提高市政给排水工程的城市服务能力。
一、市政给排水工程前期准备阶段的质量管理措施
做好前期准备工作是保证市政给排水工程的施工组织设计有效运行的前提条件,也是加强质量管理工作的有效措施。因此,在市政给排水工程施工前不可忽视前期准备工作的重要性。
(一)制定科学合理的施工组织规划
通常情况下,市政给排水工程的总体施工原则是“先地下,后地上”。也就是说,地下排水施工应尽早完成,保证城市及早地具有排水能力,再进行地上的附属设施建设。在施工前,需要结合市政给排水工程的总体施工原则,科学合理地制定施工组织规划,选择适当的施工技术和方案,以及做好劳动力和机械设备的安全管理计划,全面地保证施工过程中的质量安全。
(二)严格审核施工设计图纸
施工单位需要考察施工现场,审核及熟悉施工设计图纸,以便掌握图纸设计的施工布局、关键施工环节和薄弱施工点等重点施工内容。依据设计图纸要求和施工要求选择适当的管线材质、长度和管径,科学地设计管线走向、内底高程、坐标控制点等关键施工点。倘若发现设计图纸的某些内容不符合施工的实际要求,应当及时作出更改,避免在施工过程中出现设计变更等情况,以防造成不必要的经济损失。
(三)编制可行性强的质量管理计划
由于市政给排水工程的特殊性和复杂性,在实际施工过程中难免会出现不同程度的质量问题或一些常见的质量通病。施工单位有必要针对施工现场的实际情况,设计图纸中的重点施工环节和关键点,结合长久以来的施工经验等,编制一份可行性强的质量管理计划。同时开工前,除保证三通外,还要结合管线走向及施工开挖工作面和堆土堆料所占场地与地形地貌、地物、交通问题等。任何妨碍施工的因素都要笔录,呈请有关单位或部门协助排除。
(四)精确测量,准确放线测量放线工作是整个给排水工程施工中的重要内容之一,需要施工单位提高重视程度。在正式放线前,应当将道路中庄相关信息输入到计算机中,利用cad制图计算出平面布置中各井的坐标位置,然后使用全站仪放出各井位,保证测量放线的精确性。打桩撒灰放线时,要考虑中心线、边坡系数加宽后因开挖受限制,开挖面非变窄不可就要考虑沟槽内设置支撑保证安全施工,以免塌方伤人造成事故。 二、市政给排水工程施工阶段的质量管理
施工阶段作为工程质量形成阶段,也是工程最容易发生质量问题的主要阶段,必须重点实施质量管理与控制措施,还要掌握各个分项施工阶段中容易出现质量问题的关键施工点,以便保证市政给排水工程在施工过程中的质量安全。
(一)沟槽开挖阶段
在沟槽开挖阶段,通常采用机械设备进行挖沟推土等工作。必须合理安排开挖机械和人员,应采用机械与人工开挖相结合的措施,并在开挖前逐一探明地下既有管道、电缆和其他构筑物的位置,以便进行相应的保护、迁移等措施,保证开挖工作持续进行。开挖后,应设置一定距离的槽底高程测量。因为给排水工程的地下结构并不是一成不变的,应使其具有足够的灵活性。在这里,有一个问题需要特别注意。那就是槽底的上方不能挖掘过量,一旦超挖应及时进行回填和夯实,避免影响施工质量的不安因素的存在。 (二)管基管座施工阶段完成沟槽开挖工作后,施工人员应当按照设计图纸进行管基管座施工。为了进一步加强其施工质量,需要注意以下几个问题:不能为了节省施工成本而偷工减料,设置厚度不符合标准的管基;严格控制碎石基础的级配标准,完成碎石基础施工后,必须尽享振捣夯实工序,保证其具有较高的强度和稳定性;在管道就位前,应当事先把管座所需要的材料堆放在碎石基础上,便于管道就位后及时对其进行固定平衡。
(三)下管安装阶段首先,在管道进入施工现场后,应立即逐一复查各个管道的质量问题,对管道材料的抗渗性、抗压性进行严格的检验,检查其是否存在孔眼、漏洞、裂缝等情况,并着重检查密封胶圈位置是够出现破损及老化现象。其次,检查管基的边线、中线和预留位是否符合实际施工和实际图纸要求,合格后再进行下管工作。再次,采用机械操作进行下管,注意沟槽边缘的塌落问题,机械应当距离沟槽边缘一定距离。在下管过程中,应当采用专用的吊钩以及柔性吊索,并需要专人指挥,避免发生不必要的碰撞和损伤。倘若机械下管满足不了要求,应采用人工压绳方法。有架空线路时,保持一定的安全距离。 最后,施工人员进行复检工作,纠正管道位置,检查是否存在不知情的管道毁坏。
(四)砌筑阶段
在砌筑阶段,一定要保证混凝土的强度配置、砂浆的饱满性和井壁的尺寸等符合规定标准,并清理干净井周围的碎石残渣,才可进行浇筑和砌筑工作。在砌筑过程中需要注意以下几个问题:不能带水对垫层和基础实施浇筑;井壁要保持竖直,避免通缝;保证砌缝平整,需进行抹面压光处理,避免裂缝、空鼓等发生;井圈、井盖的安装要牢固,并采用配套的井圈与井盖设备。
(五)闭水试验阶段
闭水试验是检测水管施工质量的重要环节:首先应明确是否要做闭水试验,污水管道、雨污合流管道以及设计要求闭水的其他排水管道都必须做闭水试验,闭水试验合格后才能进行回填土。对于闭水试验的管段,应仔细检查每根管材是否有沙眼裂缝若管材出现沙眼裂缝现象。若出现裂缝,可用细砂浆修补;若有渗水部位,可调水泥浆刷补填实。此外,管口接口处必须严密。对闭水管段应不急回填,也不需要进行管材下部与条基的连接。待闭水试验合格后,再进行傍管混凝上的回填。对闭水不合格的管段,则应采取补救措施或尽快返工。
(六)施工场地恢复阶段
管道安装完毕并经水压试验合格后,经项目经理批准后及时进行管沟回填。检查井回填前先将盖板坐浆盖好,并通过测量保证标高准确后,井墙和井筒周围同时回填。工程完工后,迅速仔细地复原所有施工地面,使之恢复施工前的状态,达到监理认可的程度,并维护上述地面直至缺陷责任期结束。
三、总结语
要想保证市政给排水工程的质量安全,必须要做好施工准备阶段和施工阶段的各项相关工作,从施工管理和施工工艺等方面着重注意施工过程中重点工作内容和关键施工环节,按照施工要求和设计图纸要求,严格做好各个施工阶段的每一道工序,才能从根本上保证工程的施工质量。
参考文献:
[1] 孙凤岭,魏连富. 浅谈排水管道工程的质量控制要点[j]. 民营科技,2009,(09).
[2] 吕书川,陈永林. 浅析市政排水管道工程施工质量问题原因及防治措施[j]. 轻工设计,2011,(1).
[3] 丁景民,高建锋. 市政排水管理工程施工质量控制探讨[j]. 科技资讯,2011,(15).
关键词:市政给排水工程;质量管理
Abstract: Municipal water supply and drainage engineering as an important part of city infrastructure construction, not only need to meet the depth of city planning, but also to ensure the good city service functions, meet the industry, daily life and other service requirements. According to several years working experience in municipal consolidation drainage engineering data, in order to improve the urban water supply and drainage project of the city service ability, discusses the effective measures to strengthen the management and quality control in the construction process.
Key words: municipal water supply and drainage engineering; quality management
中圖分类号:TU992 文献标识码: A文章编号:2095-2104(2012)01-0020-02
为了满足我市地下管道网络建设的科学性与合理性,有必要针对市政给排水工程施工过程中的质量管理问题提出加强措施,全面提高供水、排水能力,减少城市路段损坏、输电线路损坏等。不仅有利于减少经济损失,也有利于提高市政给排水工程的城市服务能力。
一、市政给排水工程前期准备阶段的质量管理措施
做好前期准备工作是保证市政给排水工程的施工组织设计有效运行的前提条件,也是加强质量管理工作的有效措施。因此,在市政给排水工程施工前不可忽视前期准备工作的重要性。
(一)制定科学合理的施工组织规划
通常情况下,市政给排水工程的总体施工原则是“先地下,后地上”。也就是说,地下排水施工应尽早完成,保证城市及早地具有排水能力,再进行地上的附属设施建设。在施工前,需要结合市政给排水工程的总体施工原则,科学合理地制定施工组织规划,选择适当的施工技术和方案,以及做好劳动力和机械设备的安全管理计划,全面地保证施工过程中的质量安全。
(二)严格审核施工设计图纸
施工单位需要考察施工现场,审核及熟悉施工设计图纸,以便掌握图纸设计的施工布局、关键施工环节和薄弱施工点等重点施工内容。依据设计图纸要求和施工要求选择适当的管线材质、长度和管径,科学地设计管线走向、内底高程、坐标控制点等关键施工点。倘若发现设计图纸的某些内容不符合施工的实际要求,应当及时作出更改,避免在施工过程中出现设计变更等情况,以防造成不必要的经济损失。
(三)编制可行性强的质量管理计划
由于市政给排水工程的特殊性和复杂性,在实际施工过程中难免会出现不同程度的质量问题或一些常见的质量通病。施工单位有必要针对施工现场的实际情况,设计图纸中的重点施工环节和关键点,结合长久以来的施工经验等,编制一份可行性强的质量管理计划。同时开工前,除保证三通外,还要结合管线走向及施工开挖工作面和堆土堆料所占场地与地形地貌、地物、交通问题等。任何妨碍施工的因素都要笔录,呈请有关单位或部门协助排除。
(四)精确测量,准确放线测量放线工作是整个给排水工程施工中的重要内容之一,需要施工单位提高重视程度。在正式放线前,应当将道路中庄相关信息输入到计算机中,利用cad制图计算出平面布置中各井的坐标位置,然后使用全站仪放出各井位,保证测量放线的精确性。打桩撒灰放线时,要考虑中心线、边坡系数加宽后因开挖受限制,开挖面非变窄不可就要考虑沟槽内设置支撑保证安全施工,以免塌方伤人造成事故。 二、市政给排水工程施工阶段的质量管理
施工阶段作为工程质量形成阶段,也是工程最容易发生质量问题的主要阶段,必须重点实施质量管理与控制措施,还要掌握各个分项施工阶段中容易出现质量问题的关键施工点,以便保证市政给排水工程在施工过程中的质量安全。
(一)沟槽开挖阶段
在沟槽开挖阶段,通常采用机械设备进行挖沟推土等工作。必须合理安排开挖机械和人员,应采用机械与人工开挖相结合的措施,并在开挖前逐一探明地下既有管道、电缆和其他构筑物的位置,以便进行相应的保护、迁移等措施,保证开挖工作持续进行。开挖后,应设置一定距离的槽底高程测量。因为给排水工程的地下结构并不是一成不变的,应使其具有足够的灵活性。在这里,有一个问题需要特别注意。那就是槽底的上方不能挖掘过量,一旦超挖应及时进行回填和夯实,避免影响施工质量的不安因素的存在。 (二)管基管座施工阶段完成沟槽开挖工作后,施工人员应当按照设计图纸进行管基管座施工。为了进一步加强其施工质量,需要注意以下几个问题:不能为了节省施工成本而偷工减料,设置厚度不符合标准的管基;严格控制碎石基础的级配标准,完成碎石基础施工后,必须尽享振捣夯实工序,保证其具有较高的强度和稳定性;在管道就位前,应当事先把管座所需要的材料堆放在碎石基础上,便于管道就位后及时对其进行固定平衡。
(三)下管安装阶段首先,在管道进入施工现场后,应立即逐一复查各个管道的质量问题,对管道材料的抗渗性、抗压性进行严格的检验,检查其是否存在孔眼、漏洞、裂缝等情况,并着重检查密封胶圈位置是够出现破损及老化现象。其次,检查管基的边线、中线和预留位是否符合实际施工和实际图纸要求,合格后再进行下管工作。再次,采用机械操作进行下管,注意沟槽边缘的塌落问题,机械应当距离沟槽边缘一定距离。在下管过程中,应当采用专用的吊钩以及柔性吊索,并需要专人指挥,避免发生不必要的碰撞和损伤。倘若机械下管满足不了要求,应采用人工压绳方法。有架空线路时,保持一定的安全距离。 最后,施工人员进行复检工作,纠正管道位置,检查是否存在不知情的管道毁坏。
(四)砌筑阶段
在砌筑阶段,一定要保证混凝土的强度配置、砂浆的饱满性和井壁的尺寸等符合规定标准,并清理干净井周围的碎石残渣,才可进行浇筑和砌筑工作。在砌筑过程中需要注意以下几个问题:不能带水对垫层和基础实施浇筑;井壁要保持竖直,避免通缝;保证砌缝平整,需进行抹面压光处理,避免裂缝、空鼓等发生;井圈、井盖的安装要牢固,并采用配套的井圈与井盖设备。
(五)闭水试验阶段
闭水试验是检测水管施工质量的重要环节:首先应明确是否要做闭水试验,污水管道、雨污合流管道以及设计要求闭水的其他排水管道都必须做闭水试验,闭水试验合格后才能进行回填土。对于闭水试验的管段,应仔细检查每根管材是否有沙眼裂缝若管材出现沙眼裂缝现象。若出现裂缝,可用细砂浆修补;若有渗水部位,可调水泥浆刷补填实。此外,管口接口处必须严密。对闭水管段应不急回填,也不需要进行管材下部与条基的连接。待闭水试验合格后,再进行傍管混凝上的回填。对闭水不合格的管段,则应采取补救措施或尽快返工。
(六)施工场地恢复阶段
管道安装完毕并经水压试验合格后,经项目经理批准后及时进行管沟回填。检查井回填前先将盖板坐浆盖好,并通过测量保证标高准确后,井墙和井筒周围同时回填。工程完工后,迅速仔细地复原所有施工地面,使之恢复施工前的状态,达到监理认可的程度,并维护上述地面直至缺陷责任期结束。
三、总结语
要想保证市政给排水工程的质量安全,必须要做好施工准备阶段和施工阶段的各项相关工作,从施工管理和施工工艺等方面着重注意施工过程中重点工作内容和关键施工环节,按照施工要求和设计图纸要求,严格做好各个施工阶段的每一道工序,才能从根本上保证工程的施工质量。