结合华电国际邹县发电厂四期工程2×1000MW超超临界机组在设计及设备选型阶段的工程实践,对选用双列高加布置方案或单列高加布置方案的利弊进行了详细的论述,所述内容应对以后的超超临界机组的系统设计有所借鉴作用。
Combining with the engineering practice of 2 × 1000 MW ultra-supercritical pressure unit of Huadian Dianzi Zouxian Power Plant’s Phase 4 project in design and equipment selection stage, the advantages and disadvantages of using double row plus plus or single row plus plus arrangement are discussed in detail, The contents of the response to future ultra-supercritical unit system design reference.