搜索筛选:
搜索耗时0.0324秒,为你在为你在61,042,058篇论文里面共找到 17 篇相符的论文内容
发布年度:
[期刊论文] 作者:Meifeng Cai,,
来源:Journal of Rock Mechanics and Geotechnical Engineering 年份:2016
Rockburst is a kind of artificial earthquake induced by human activities,such as mining excavations.The mechanism of rockburst induced by mining disturbance is...
[期刊论文] 作者:Zhuoying Tan Meifeng Cai,
来源:北京科技大学学报:英文版 年份:2006
...
Evaluation on Stability of Stope Structure Based on Nonlinear Dynamics of Coupling Artificial Neural
[期刊论文] 作者:Meifeng Cai,Xingping Lai,
来源:北京科技大学学报 年份:2004
The nonlinear dynamical behaviors of artificial neural network (ANN) and their application to science and engineering were summarized. The mechanism of two kind...
Monitoring and analysis of nonlinear dynamic damage of transport roadway supported by composite hard
[期刊论文] 作者:Meifeng Cai,Xingping Lai,
来源:北京科技大学学报 年份:2004
The study concentrates mainly on the development of failure process in composite rock mass. By use of acoustic emission(AE), convergence inspection, pressure mo...
[期刊论文] 作者:Meifeng Cai,Hua Peng,
来源:岩石力学与岩土工程学报:英文版 年份:2011
In-situ stress is an essential parameter for design and construction of most engineering projects that involve excavation in rocks.Progress in in-situ stress me...
Evaluation on Stability of Stope Structure Based on Nonlinear Dynamics of Coupling Artificial Neural
[期刊论文] 作者:Meifeng Cai,Xingping Lai,
来源:城市道桥与防洪 年份:2002
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥...
GIS-based 3D limit equilibrium analysis for design optimization of a 600 m high slope in an open pit
[期刊论文] 作者:Meifeng Cai,Mowen Xie,Chunlei,
来源:北京科技大学学报(英文版) 年份:2004
Combining the GIS (geographic information systems) grid-based data with four proposed column-based 3D slope stability analysis models,a comprehensive solution o...
Considerations of rock dilation on modeling failure and deformation of hard rocks-a case study of th
[期刊论文] 作者:Xingguang Zhao,Meifeng Cai,M.C,
来源:岩石力学与岩土工程学报(英文版) 年份:2004
For the compressive stress-induced failure of tunnels at depth,rock fracturing process is often closely associated with the generation of surface parallel fract...
[期刊论文] 作者:Zhuoying Tan,Meifeng Cai,Xingg,
来源:北京科技大学学报(英文版) 年份:2004
In order to reveal the strength deterioration law of rock mass under an acidified environment, a series of experiments on strength deterioration and the environ...
Considerations of rock dilation on modeling failure and deformation of hard rocks-a case study of th
[期刊论文] 作者:Xingguang Zhao,Meifeng Cai,M.C,
来源:黑龙江科技学院学报 年份:2010
为探究吕家坨井田地质构造格局,根据钻孔勘探资料,采用分形理论和趋势面分析方法,研究了井田7...
[期刊论文] 作者:Meifeng Cai,Lan Qiao,Changhong,
来源:城市道桥与防洪 年份:2001
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥...
Instrumented borehole drilling for interface identification in intricate weathered granite ground en
[期刊论文] 作者:Zhuoying Tan,Meifeng Cai,Z.Q.,
来源:城市道桥与防洪 年份:2007
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥...
[期刊论文] 作者:Zhenhua Ouyang,Meifeng Cai,Cha,
来源:城市道桥与防洪 年份:2006
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥...
[期刊论文] 作者:Zhuoying Tan,Meifeng Cai,Zhong,
来源:城市道桥与防洪 年份:2005
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥...
[期刊论文] 作者:Meifeng Cai,Shuhua Hao,Honggua,
来源:城市道桥与防洪 年份:2008
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥...
GIS-based 3D limit equilibrium analysis for design optimization of a 600 m high slope in an open pit
[期刊论文] 作者:Meifeng Cai,Mowen Xie,Chunlei,
来源:城市道桥与防洪 年份:2007
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥...
[期刊论文] 作者:Meifeng Cai,Lan Qiao,Bo Yu,Shu,
来源:城市道桥与防洪 年份:2000
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥...
相关搜索: