搜索筛选:
搜索耗时0.0855秒,为你在为你在102,285,761篇论文里面共找到 12 篇相符的论文内容
类      型:
[期刊论文] 作者:GuoShang Wang,QiHao Yu,YanHui, 来源:寒旱区科学:英文版 年份:2014
Construction of power transmission lines is becoming an important part of permafrost engineering in China.This paper reviews the construction status and problem...
[期刊论文] 作者:YanLi Xie,QiHao Yu,YanHui You,, 来源:寒旱区科学:英文版 年份:2019
After the construction of Qinghai-Tibet Highway and Railway,the Qinghai-Tibet Power Transmission(QTPT)line is another major permafrost engineering project with...
[期刊论文] 作者:Chang Yuan,FuJun Niu,QiHao Yu,, 来源:寒旱区科学:英文版 年份:2015
The Haerbin-Dalian Passenger Dedicated Line is the first high-speed railway constructed in the seasonally frozen ground regions of northeastern China. Frost hea...
[期刊论文] 作者:YanLi Xie,QiHao Yu,YanHui You,, 来源:黑龙江科技学院学报 年份:2004
为探究吕家坨井田地质构造格局,根据钻孔勘探资料,采用分形理论和趋势面分析方法,研究了井田7...
[期刊论文] 作者:Wei Gu QiHao Yu Jin Qian HuiJu, 来源:寒旱区科学:英文版 年份:2010
作为在中国计划的国家高速公路网络的一部分,到拉萨的从 Golmud 的Qinghai西藏高速公路( QTE )将越过永久冻土 lands.Due 的大约 630 km 在Qinghai西藏高原( QTP )的内部被造...
[期刊论文] 作者:Lei Guo,QiHao Yu,XiaoNing Li,X, 来源:寒旱区科学:英文版 年份:2015
In the construction of the Qinghai-Tibet Power Transmission Line(QTPTL), cast-in-place piles(CIPPs) are widely applied in areas with unfavorable geological cond...
[期刊论文] 作者:Wei Gu,QiHao Yu,Jin Qian,HuiJu, 来源:寒旱区科学 年份:2010
本文通过对荣华二采区10...
[期刊论文] 作者:Lei Guo,QiHao Yu,XiaoNing Li,XinBin Wang,YongYu Yue,, 来源:Sciences in Cold and Arid Regions 年份:2015
In the construction of the Qinghai-Tibet Power Transmission Line(QTPTL), cast-in-place piles(CIPPs) are widely applied in areas with unfavorable geological cond...
[期刊论文] 作者:YanLi Xie,QiHao Yu,YanHui You,ZhongQiu Zhang,TingTao Gou,, 来源:Sciences in Cold and Arid Regions 年份:2019
After the construction of Qinghai-Tibet Highway and Railway, the Qinghai-Tibet Power Transmission(QTPT) line is another major permafrost engineering project with new types of engineering structures. T...
[期刊论文] 作者:Chang Yuan,FuJun Niu,QiHao Yu,XinBin Wang,Lei Guo,YanHui You,, 来源:Sciences in Cold and Arid Regions 年份:2015
The Haerbin-Dalian Passenger Dedicated Line is the first high-speed railway constructed in the seasonally frozen ground regions of northeastern China. Frost hea...
[期刊论文] 作者:Chang Yuan,FuJun Niu,QiHao Yu,XinBin Wang,Lei Guo,YanHui You,, 来源:Sciences in Cold and Arid Regions 年份:2015
The Haerbin-Dalian Passenger Dedicated Line is the first high-speed railway constructed in the seasonally frozen ground regions of northeastern China. Frost heave diseases occurred in the first winter...
[期刊论文] 作者:GuoShang Wang,QiHao Yu,YanHui You,Ze Zhang,Lei Guo,ShiJun Wang,Yong Yu,, 来源:Sciences in Cold and Arid Regions 年份:2014
Construction of power transmission lines is becoming an important part of permafrost engineering in China.This paper reviews the construction status and problems of transmission lines in different cou...
相关搜索: