搜索筛选:
搜索耗时0.1142秒,为你在为你在102,285,761篇论文里面共找到 16 篇相符的论文内容
发布年度:
An ideal point method adopting grey relational entropy to estimate life cycle cost with effectivenes
[期刊论文] 作者:LIANG Qing-wei,SONG Bao-wei,
来源:哈尔滨工业大学学报(英文版) 年份:2004
To making the decision of the developing blue prints, ideal point method was selected to estimate the life cycle cost with effectiveness of torpedo. At the same...
An ideal point method adopting grey relational entropy to estimate life cycle cost with effectivenes
[期刊论文] 作者:LIANG Qing-wei,SONG Bao-wei,
来源:城市道桥与防洪 年份:2008
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥...
[期刊论文] 作者:LI Jia-Wang SONG Bao-Wei SHAO,
来源:自动化学报 年份:2008
追踪轨道的控制问题被调查为一自治在水下作为致动器用一个内部点团和一个后面的推进器搬到垂直飞机的车辆(AUV ) 。与点团的动力学结合了, AUV 作为一个 underactuated 系统...
Modeling and Simulation of A Novel Autonomous Underwater Vehicle with Glider and Flapping-Foil Propu
[期刊论文] 作者:TIAN Wen-long,SONG Bao-wei,DU,
来源:黑龙江科技学院学报 年份:2012
为探究吕家坨井田地质构造格局,根据钻孔勘探资料,采用分形理论和趋势面分析方法,研究了井田7...
[期刊论文] 作者:LIU Xu-lin,SONG Bao-wei,WANG J,
来源:兵工学报 年份:2004
Scheme evaluation and selection is an optimum selecting and sequencing problem with multi-objective and multi-level. It cant follow single objective function or...
[期刊论文] 作者:YU De-hai,SONG Bao-wei,LI Jia-,
来源:兵工学报(英文版) 年份:2004
A torpedo multidisciplinary design optimization (MDO) based on the collaborative optimization is proposed. Through decomposition and coordination, some problems...
[期刊论文] 作者:YU De-hai,SONG Bao-wei,LI Jia-,
来源:船舶与海洋工程学报 年份:2004
An optimized methodology to design a more robust torpedo shell is proposed. The method has taken into account reliability requirements and controllable and unco...
[期刊论文] 作者:SONG Bao-wei,SHAO Cheng,ZHU Ho,
来源:兵工学报 年份:2004
As only a little information can be obtained from torpedos lake and sea tests, and the torpedos life does not distribute typically. If conventional methods are...
[期刊论文] 作者:HU Hai-bao,SONG Bao-wei,LIU Zh,
来源:兵工学报(英文版) 年份:2004
A display and analysis system for hermetical flow field in water tunnel is developed based on the particle image velocimetry(PIV) technology. It consists of som...
[期刊论文] 作者:HU Hai-bao,SONG Bao-wei,LIU Gu,
来源:兵工学报(英文版) 年份:2004
Through the numerical simulation investigation, the turbulent drag reduction mechanisms of shark riblet surface are explored. In allusion to the characteristics...
[期刊论文] 作者:SHAO Cheng,SONG Bao-wei,DU Xia,
来源:兵工学报(英文版) 年份:2009
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥...
[会议论文] 作者:LI Jian,SONG Bao-wei,CAO Yong-hui,
来源:第十四届全国水动力学学术会议暨第二十八届全国水动力学研讨会 年份:2017
Coupled six-degree-of-freedom(6-DOF) trajectory predictions and the technique of dynamic mesh, numerical investigation is conducted to analyze the effects of the interior store separation from one sid...
[期刊论文] 作者:Song Bao-Wei,Ren Feng,Hu Hai-Bao,Huang Qiao-Gao,
来源:中国物理B(英文版) 年份:2015
...
[期刊论文] 作者:DU Xiao-xu,SONG Bao-wei,HU Hai-bao,SHAO Cheng,
来源:城市道桥与防洪 年份:2007
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥...
[期刊论文] 作者:邵成,SONG Bao-wei,李家旺,DU Xiao-xu,
来源:系统仿真学报 年份:2008
...
[期刊论文] 作者:王鹏,SONG Bao-wei,刘旭琳,YU De-hai,,
来源:系统仿真学报 年份:2004
分析了基于响应面近似模型的并行子空间设计方法RS-CSD的执行过程和步骤,将鱼雷外形设计划分为减阻设计和声学设计两个学科,建立了其学科分析模型和系统优化模型,针对某型鱼...
相关搜索: