T(o)sustain development of our first new town,Tsuen Wan,drainage improvement works were carried out in Tsuen Wan and its adjacent district Kwai Chung in order to alleviate flooding impact to them.One of the major works of the drainage improvement was to lay a large diameter stormwater pipe across heavily trafficked Texaco Road which is a strategic road and houses numerous underground utilities such as gas pipes,storm and foul drains,power cables and pressurized water mains including a freshwater trunk main and an asbestos cement saltwater main.To carry out the drainage improvement works under the above site constraints while to ensure a safe and healthy working environment as well as to minimize disturbance to the residents in the neighborhood,we devised an innovative grouted jacket as a major protection measure to existing water mains for laying of stormwater pipe by trenchless construction.The grouted jacket could overcome the inadequacy of soil arching strength due to shallow soil cover,eliminate the risk of flooding the workers inside the pipe bore in case of bursting of water main,and confine the pipe jacking activities within the grouted jacket.To construct the grouted jacket,ODEX drilling method was adopted with a revised Tube-A-Manchette(TAM)grouting method.Successful completion of the grouted jacket and pipe jacking for the drainage improvement works were achieved.
其他文献
本文介绍了长江隧道工程泥水系统采用两套法国MS泥水处理系统,研究人员在消化吸收的基础上对集成式模块化泥水处理方案进行了优化设计.方案中的电气系统设计包括电气图纸设计
本文介绍了国内外盾构设备及其工作要求,详细介绍了盾构液压油的发展现状和高洁净度抗磨液压油的研制过程及应用情况,通过研究和理化性能评价以及实际使用,认为目前国产高洁
本文介绍重庆轨道交通3号线地下区间近距离上跨病害隧道设计.菜园坝大桥至牛角沱地下区间距原有病害隧道很近,在设计施工中,对单跨跨越、管梁跨越、门式框架跨越等多种方案对
本文介绍了在杭州地区粉砂、粉土地层,地下水丰富的情况下,通过对盾构机进、出洞端头地层实施深层搅拌桩与高压旋喷桩施工,并布设降水井降低地下水位,提高破除围护结构后洞门
本文通过对盾构挖掘机刀盘驱动器使用的齿轮油进行全面性能分析研究,提出了增加抗磨极压剂的方法,解决了刀盘驱动器扭矩波动和齿轮油箱中油温升高问题;深入分析了不同抗磨剂对
Traces of asbestos-bearing rocks were encountered just before the completion of the excavation of the Cesana tunnel.The type of mineralization is that of amphib
The construction of Kent Ridge Station of Contract 855 of Circle Line Project in Singapore adopted a standard cut and cover method using contiguous bored piles
The main railway tunnel hosts two 107m long junction caverns within the area of the Imperia Station.The first is located at a distance of 100m from the Imperia
会议
The West Kowloon flood relieving project comprising a drainage tunnel of 4.9m finished diameter,3.7km long,and a water transfer tunnel of 3.0m diameter,2.8km lo
根据重庆高速公路典型路段的实测交通数据和历史交通数据,对重庆市现有高速公路的交通组成进行了分析.根据分析认为:重庆市高速公路的交通量分布明显不均,重载比例较大;重庆市