In Situ Tests on Fatigue Characteristics of Top-mounted Dividable Pile-board Structure Subgrade in H

来源 :高速铁路、线路工程设计理论、施工及养护技术国际学术会议 | 被引量 : 0次 | 上传用户:yangsh1967
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
The top-mounted dividable pile-board structure subgrade is a new type of high speed railway line structure crossing weak foundation.The train loading can lead to greater alternating stress in this structure through the track structure,so it is necessary to technically research the last-term performance of pile-board structure using the true-to-scale in situ tests.The forced vibration loading is repeated 1 million times in different cross-sections of pile-board structure for high-speed railway using the in situ dynamic testing system DTS-1,to simulate the fatigue characteristics of the pile-board structure under long-term dynamic load.
其他文献
根据我国无砟轨道建设和运营经验,提出了一种全新的后张预应力纵连板式无砟轨道结构,该结构具有板式轨道和双块式轨道的优点.轨道纵向施加了预应力,在列车荷载和温度荷载作用
  通过遂渝线现场实测,对CRH2动力分散型机车及货车在桩板结构路基试验段高速行车条件下的动响应规律进行了研究,分析列车速度及轴重对路基动力响应的影响。分析表明:随车速的
  目前中国高速铁路路基压实质量检测指标综合了世界各国高速铁路路基压实指标。为了研究适合中国实际的高速铁路路基压实检测指标,进行了中德击实试验和现场压实试验,并收集
  桩网结构路基是路基的一种加固方法。本文主要应用FLAC3D数值计算软件,基于高低2种路堤,8种不同的桩间距,对桩网结构路基的分层填筑和列车的运营进行了数值计算,分析表明
  铁路客运系统符合灰色系统的特征,本文基于GM(1,1)模型用不同长度数列建模预测我国2005-2007年的铁路客运量,并检测所建模型,对不合格模型用指数加权平均法校正。预测结
  根据桥上无缝道岔受力和变形特点,建立了道岔-桥梁-墩台一体化计算模型,利用有限元法对模型求解。以浙赣线湄池1号大桥为例,分析了桥上无缝道岔的受力与变形的特性,测试了桥
Taking a longitudinal continuous ballastless turnout on LeiDa bridge on Wuhan-Guangzhou Passenger dedicated Line(PDL,in China)for instance,an integral finite el
通过室内土质路基无砟轨道基床模型试验的研究,分析了在分级静载和分级循环加载的条件下,降雨前、后基床的静、动态力学特性.试验表明,无论是静响应还是动态响应在基床横断面
为分析桩网复合地基的垫层效应,进行了四组不同桩帽尺寸的桩网复合地基现场试验,测试了路堤荷载作用下的地基沉降、基底压力和垫层筋带拉力等数据.结果表明:①在桩顶处设置桩
In this paper,the double-row prestressed anchor piles on a site are used as the project background,FLAC3D procedures is used to establish the three-dimensional