一、基本情况东北地区大中型水电站水库八座,共装机313.55万千瓦,搬迁移民7.56万人,淹没耕地10.42万亩。除了在建中的鸭绿江上渭源水电站水库尚有一部分移民正在安置外,其余均得到了妥善安置。六十年代修建的桓仁、云峰水电站移民费用人均在320~600元间;七十年代则每个移民费用在1000元左右,到八十年代水库
First, the basic situation Large and medium-sized hydropower reservoirs in Northeast China eight, a total installed capacity of 3.1365 million kilowatts, relocation of 75,600 immigrants, 1,042,000 acres of flooded farmland. Except for a part of resettlers still being resettled in the reservoirs at the Weifang Hydropower Station under construction in the Yalu River, the rest have been properly resettled. Huanren built in the 1960s, Yunfeng hydropower station per capita migration costs 320 to 600 yuan; in the seventies each immigrant costs about 1,000 yuan, to the eighties reservoir