为了进行白龙江流域补充规划工作,水电部西北勘测设计院规划处、技术处、勘测总队、地勘五队于84年10月中旬至11月上旬,联合组织了白龙江流域的查勘工作。查勘自白龙江干流昭化至迭部,支流白水江玉垒至黑河塘河段,查勘里程近700公里,坝址18个。另外查勘组与水工处、施工处同志共同对紫兰坝,麒麟寺、苗家坝三个坝址进行了踏勘,讨论了下一步开展地勘工作的有关问题。
In order to supplement the Bailongjiang River basin planning, the Planning Department, the Technical Department, the Survey Corps and the Geological Exploration and Reconnaissance Corps of the Northwest Survey and Design Institute of the Ministry of Electricity and Mines jointly organized the survey of Bailongjiang River Basin from mid-October to early November. The survey was carried out from Zhaohua to Diebu, the main stream of the Longjiang River, and from Yuzhai, a tributary of the Baishui River, to the Heihe River section of the Heihe River. The survey site covers an area of nearly 700 kilometers with 18 dam sites. In addition, the investigation team, together with the Department of Hydraulic Engineering and Construction Division, conducted a reconnaissance of the three dam sites, namely, the Purple Lanba, the Kirin Temple and the Miajiaba Dam, and discussed the relevant issues for the next step in carrying out geological prospecting work.